Unit of competency Outline

Date retreived
23/07/2026 10:34 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Set up and dismantle temporary work location and equipment at motor sport events

Set up and dismantle temporary work location and equipment at motor sport events

Unit of competency
National Code
AURMGA001
State Code
AXC19
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
14/04/2016
State Implementation and Classification
Approved Date
13/07/2016
Field of Education
092103 - Sports Coaching, Officiating And Instruction
Original Release Date
13/07/2016
Nominal Hours
16
Description
This unit describes the performance outcomes required to set up a temporary work location and equipment at a motor sport event according to team requirements. It involves preparing, setting up and dismantling a temporary work location and equipment storage, laying out equipment, erecting team promotional signage, and setting up a functional workspace in the temporary location.It applies to those working in the motor sport industry.No licensing, legislative, regulatory or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Prepare site
  • 1.1 Site information and requirements are determined and confirmed with site supervisor or circuit manager
  • 1.2 Security and confidentiality issues are considered and risk management measures selected
  • 1.3 Hazards associated with work site are identified and risks are managed according to workplace procedures and safety requirements
  • 1.4 Access paths are considered when positioning equipment and tooling, and measures are taken to eliminate hazards
2. Assemble temporary work shelter
  • 2.1 Tools and equipment are unloaded from transporters according to safety requirements and team requirements and procedures
  • 2.2 Work shelter is sourced and fittings information interpreted
  • 2.3 Shelter and associated fittings are assembled, erected and secured according to shelter manufacturer procedures, team requirements, event supplementary regulations, and safety requirements
  • 2.4 Problems with temporary work shelter are identified and reported to appropriate persons according to team procedures as required
3. Position equipment and tooling in work area
  • 3.1 Equipment is assembled and prepared according to manufacturer procedures, team requirements and safety requirements
  • 3.2 Equipment is positioned according to team requirements, controlling body rules, category rules and supplementary regulations, and safety requirements
  • 3.3 Required personal protective equipment (PPE) is identified, fitted and installed according to manufacturer specifications and team requirements
  • 3.4 Problems with work area are identified and reported to appropriate persons according to team procedures as required
  • 3.5 Effectiveness of area layout is monitored during use, and recommendations are made for change to appropriate persons as required
4. Dismantle temporary work shelter
  • 4.1 Shelter is cleaned, dismantled and packed in preparation for transportation according to team procedures and safety requirements
  • 4.2 Tooling and equipment are accounted for, checked and packed in preparation for transportation according to team procedures and safety requirements
  • 4.3 Shelter, tools and equipment are loaded on to vehicle transporters according to team procedures and safety requirements
  • 4.4 Work area is cleaned and inspected for serviceable condition according to team procedures and local requirements
  • 4.5 Potential vehicle performance enhancement solutions are identified
  • 4.6 Problems with required data or operation of equipment are reported to appropriate persons
5. Present data
  • 5.1 End users of statistical data and their preferred format are identified
  • 5.2 Data is represented to meet end user needs
  • 5.3 Recommendations are documented and presented with supporting data
6. Complete work processes
  • 6.1 Equipment and support material are cleaned, maintained and prepared ready for further use according to manufacturer procedures and team requirements
  • 6.2 Faults in acquisition systems and components are diagnosed
  • 6.3 Unserviceable equipment and faults are documented and appropriate action is taken according to team procedures
No information
No information
Replaces
State Code National Code Title Type
WF259 AURMGA2001 Set up and dismantle temporary work location and equipment Unit of competency
Replaced By
State Code National Code Title Type
OCL09 AURMGA101 Set up and dismantle temporary work location and equipment at motor sport events Unit of competency
State Code National Code Title Type
BAE0 AUR21016 Certificate II in Motor Sport Technology Qualification
BAC7 AUR30916 Certificate III in Motor Sport Technology Qualification