Unit of competency Outline

Date retreived
23/07/2026 3:13 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Design, construct and maintain aquascapes

Design, construct and maintain aquascapes

Unit of competency
National Code
ACMCAS403A
State Code
D3876
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
11/11/2010
State Implementation and Classification
Approved Date
01/07/2014
Field of Education
050105 - Animal Husbandry
Original Release Date
01/07/2014
Nominal Hours
100
Description
This unit of competency covers the process of designing, constructing and maintaining aquascapes for a range of aquaria, including ponds, waterfalls and water features.No licensing, legislative, regulatory or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Identify client needs
  • 1.1. Types of aquaria and proposed species to be housed are established.
  • 1.2. Proposed location and climatic conditions affecting design are identified.
  • 1.3. Special installation and/or maintenance requirements are confirmed with client.
  • 1.4. Advice on suitability of species and location is provided to client.
2. Prepare aquascape design
  • 2.1. Appropriate heating, lighting and filtration requirements are identified and selected according to the design parameters.
  • 2.2. Plants, features and substrate materials are selected according to the design parameters.
  • 2.3. Aquascape design is prepared in accordance with industry best practice and client needs.
3. Establish aquascape
  • 3.1. Tools, equipment and materials appropriate to the job and occupational health and safety (OHS) requirements are selected and used, including personal protective equipment.
  • 3.2. Substrate is established, using appropriate materials in accordance with the design.
  • 3.3. Aquascape features and plants are installed and secured in accordance with the design and industry standards.
  • 3.4. Installation, testing and commissioning of lighting, heating and filtration systems are conducted in accordance with manufacturers' requirements.
  • 3.5. Ongoing maintenance requirements are discussed with client in preparation for handover.
  • 3.6. Waste from construction and installation is collected, treated and disposed of or recycled in accordance with organisational and environmental requirements.
  • 3.7. Worksite, tools and equipment are cleaned, returned to operating order and stored according to OHS and organisational requirements.
4. Maintain aquascapes
  • 4.1. Water sampling and testing are conducted in accordance with species type and environmental requirements.
  • 4.2. Isolation of electrical equipment prior to maintenance is proven using appropriate techniques, procedures and equipment.
  • 4.3. Service and repairs are carried out according to manufacturers' specifications and organisational requirements.
  • 4.4. Health of aquaria and plants is monitored and reported.
  • 4.5. Complex faults are identified and referred for specialist advice and/or remedial action in accordance with organisational requirements.
  • 4.6. Accurate records are maintained in accordance with industry requirements and organisational policies and procedures.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Aquaria may include:
fresh and marine aquaria, pools and water features.
Aquascape design may include:
air pumps and water pumps
lighting
mechanical and electrical devices
natural and artificial features
substrate material.
Heating, lighting and filtration equipment used in an aquascape may include:
advanced systems, including ultraviolet (UV) and ozone
energy requirements of pumping system and its suitability for aquaria selected
heating systems, including gas, electric and solar
infrastructure, including seepage pits and permaculture considerations
lighting systems, including UV, fluorescent, incandescent, metal halide and mercury vapour
mechanical, chemical and biological filtration systems.
Plants and features may include:
natural and artificial plants.
Tools and equipment may include:
surveying and levelling equipment:
levels and pegs
notebook, pencil and calculator
tools:
hammers
hose and hose fittings
rakes
rollers
shovels and spades
wheelbarrows
OHS hazards associated with the installation and maintenance of aquascape systems may include:
disturbance of utilities and services
hazards from the use of hired equipment
moving machinery, powered equipment and hand tools
solar radiation, dust and noise
uneven surfaces and holes
working in confined spaces and water hazards.
Personal protective equipment may include:
animal handling gauntlets
gloves
overalls
hard hats
hearing or eye protection
respirators or face masks
sun hats and sunscreen lotion
work boots.
Water sampling and testing may include:
tests for pH, salinity, chlorine, electro-conductivity, chloride, calcium carbonate, iron, turbidity and biological oxygen demand.
Service and repairs may include:
cleaning a range of aquaria surfaces, including glass, concrete and plastic
maintaining a range of filtration, pumping and heating systems
maintaining seepage pits and permaculture environments
salinity control, pH correction and chlorine neutralisers
water stabilizers.
Complex faults may include:
problems that are beyond the scope of service personnel and require the services of a licensed electrical tradesperson:
construction issues
power supply issues
plumbing issues
water quality issues.
EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit. Assessors should ensure that candidates can:
identify client's needs and produce a range of aquascape designs that provides a suitable environment for the selected species and desired features
construct aquascapes in accordance with OHS and organisation policies and procedures
identify cause and effect of environmental problems and implement corrective action
apply correct cleaning and maintenance techniques
maintain records and required documentation.

The skills and knowledge required to design, construct and maintain aquascapesmust be transferable to a range of work environments and contexts and include the ability to deal with unplanned events.

Context of and specific resources for assessment
Assessment of this unit is to be practical in nature and will be most appropriately assessed in companion animal workplaces that design, construct and maintain aquascapes for clients or in a situation that reproduces normal work conditions.

There must be access to a range of aquatic species or breeds as well as the relevant information, materials and documentation.

Method of assessment
To ensure consistency in one's performance, competency should be demonstrated, to industry defined standards, on more than one occasion over a period of time in order to cover a variety of circumstances, cases and responsibilities, and over a number of assessment activities.

The assessment strategies must include practical skills assessment. Suggested strategies for this unit are:
written and/or oral assessment of candidate's required knowledge
observed, documented and firsthand testimonial evidence of candidate's application of practical tasks
simulation exercises that reproduce normal work conditions
workplace documentation (e.g. aquascape design plans)
third-party evidence
portfolio.

This unit may be assessed in a holistic way with other units of competency relevant to the industry sector, workplace and job role.

Guidance information for assessment
Assessment methods should reflect workplace demands (e.g. literacy and numeracy demands) and the needs of particular target groups (e.g. people with disabilities, Aboriginal and Torres Strait Islander people, women, people with a language background other than English, youth and people from low socioeconomic backgrounds).
Replaces
State Code National Code Title Type
S3949 RUV4505A Design, construct and maintain aquascapes Unit of competency
Replaced By
State Code National Code Title Type
BBE10 ACMCAS403 Design, construct and maintain aquascapes Unit of competency
State Code National Code Title Type
W988 SFI40111 Certificate IV in Aquaculture Qualification
S685 ACM40310 Certificate IV in Companion Animal Services Qualification