Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install flashings and damp proof course
Install flashings and damp proof course
Unit of competency
National Code
CPCCBL3009
CPCCBL3009
State Code
OCQ68
OCQ68
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040313 - Ceiling, Wall And Floor Fixing
Original Release Date
01/06/2021
Nominal Hours
8
Description
This unit specifies the skills and knowledge required to use various materials for flashings and damp proofing. It includes installing vertical and head flashing to windows and doors and stepped and tray flashing to parapets.This unit applies to bricklayers or blocklayers who work on new and existing structures. It is suitable for people operating with some autonomy. A person working at this level would be expected to take responsibility for organising and completing tasks assigned to them without needing close supervision.Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of CPCWHS1001Prepare to work safely in the construction industrymeets this requirement.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare for work.
- 1.1 Select, fit correctly and use personal protective equipment (PPE) appropriate for job.
- 1.2 Read, interpret and apply flashing and damp proof course requirements from current plans, specifications and codes.
- 1.3 Follow requirements in workplace safety and environmental documentation and workplace procedures.
- 1.4 Use measurements and apply formulas to calculate material quantities.
- 1.5 Determine job priorities and sequence job tasks in consultation with others on site.
- 1.6 Identify potential hazards and determine and implement control measures.
- 1.7 Select and check condition of plant, equipment and tools and report damage or faults to relevant person.
- 1.8 Check conformity of materials against the specifications and place materials in preparation for the work.
2 Prepare material and surface.
- 2.1 Inspect specified materials for defects, damage or non-compliance with specifications.
- 2.2 Locate position of impervious material from plans and specifications.
- 2.3 Prepare structure and surface to manufacturer’s specifications.
- 2.4 Measure and cut flashing material allowing for specified laps.
3 Install flashing and damp-proof course (DPC).
- 3.1 Dress flashing and DPC materials in preparation for installation.
- 3.2 Lay, lap and fit or build in flashings and DPC to prevent moisture movement and divert the travel of moisture.
- 3.3 Form and seal flashing and moisture barrier around openings.
- 3.4 Finish any exposed flashing and moisture barrier.
- 3.5 Locate and ensure weep holes are clean and functional.
4 Clean up.
- 4.1 Clear the work area, and dispose of, reuse or recycle materials following workplace and environmental requirements.
- 4.2 Clean tools and equipment, check for serviceability and report damage or faults.
- 4.3 Store and secure tools and equipment following workplace procedures.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W9328 | CPCCBL3009A | Install flashings and damp proof course | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGD8 | CPC33020 | Certificate III in Bricklaying and Blocklaying | Qualification |