Unit of competency Outline

Date retreived
23/07/2026 5:06 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Plan the deployment of access network architectures

Plan the deployment of access network architectures

Unit of competency
National Code
ICTNPL4108A
State Code
D3350
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
15/06/2010
State Implementation and Classification
Approved Date
12/06/2014
Field of Education
080315 - Project Management
Original Release Date
12/06/2014
Nominal Hours
50
Description
This unit describes the performance outcomes, skills and knowledge required to plan the deployment of network architecture when conducting access network telecommunications work. It includes use and consideration of access network deployment data, technology, equipment, capacity management and network management information sources.The plan may be for a new installation or upgrade of capacity or technology for existing network or subsystem for convergence to Next Generation Networks (NGN).No licensing, legislative, regulatory or certification requirements apply to this unit at the time of endorsement but users should confirm requirements with the relevant federal, state or territory authority.
Notes
Elements and Performance Criteria
1. Scope the project
  • 1.1. Prepare for work according to site specific safety requirements and enterprise occupational health and safety (OHS) processes and procedures
  • 1.2. Determine the type of access network by accessing and using network information sources
  • 1.3. Produce a brief on how access network architecture components relate to the larger network and their impact on the work
  • 1.4. Evaluate the equipment type and technologies to be considered to determine availability and compatibility with existing network equipment
  • 1.5. Obtain resources and equipment needed for the work according to enterprise procedures and check for correct operation and safety
  • 1.6. Assess the capacity limitation of various platforms in the context of the work to ensure maximum network performance
  • 1.7. Determine product capability and calculate allowable capacity of the Access Network to allow for network growth
2. Produce deployment plan for an Access Network
  • 2.1. Conduct planning work using current equipment components and complying with access network deployment rules and exemption process criteria
  • 2.2. Produce a preliminary plan on the deployment of the network that maintains integrity of the access network
  • 2.3. Discuss unexpected situations with appropriate personnel, with consideration to job specifications, safety and enterprise procedures to establish a solution
  • 2.4. Review plan to ensure that it complies with all standards and codes required when working on network access and where appropriate make adjustments
3. Complete work and report its impact on network access
  • 3.1. Produce final deployment plan including recommendations agreed with the customer
  • 3.2. Provide a report on network monitoringtechniques used to manage the network to ensure the network is performing at optimum level
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Access network may refer to:
broadband:
wireless fidelity (WiFi)
world interoperability for microwave access (WiMAX)
copper:
coaxial
HFC
twisted pair
digital services:
asymmetrical digital subscriber lines (ADSL)
digital subscriber lines (DSL)
NGN:
broadband access
data transfer
internet protocol (IP) based systems
internet protocol private branch exchange (IP PBX)
Internet protocol TV (IPTV)
mobile data
mobile telephony
multimedia
video
voice over internet protocol (VoIP)
optical:
FTTN
FTTP
FTTx
HFC
wireless networks:
cellular
microwave
radio
satellite.
Network information sources may include:
network management databases for:
capacity assessment data
network performance data
traffic dimensioning data
network management tools.
Access network architecture components may include:
copper network:
copper cable
lead-in
lightning protection
line power supply
loading coils
main distribution frame
pair gain system
Ethernet broadband remote access server (EBRAS)
HFC network
IP edge
optical:
add/drop multiplexer
broadband passive optical network (BPON)
cross connect unit
distribution/lead-in multi-port (DLM/LM)
fibre access points
fibre distribution hub (FDH)
gigabit passive optical network (GPON)
high density/optical fibre distribution frame (HD/OFDF)
home optical network terminal
optical distribution network
optical fibre
optical receiver
packet optical line terminal (P-OLT)
video optical line terminal (V-OLT)
wave division multiplexer (WDM)
wireless network:
antennae
dish
headend
hubs and nodes
radio towers and huts
radio frequency (RF) amplifier
RF transmitters and receivers
satellite
tap
waveguide
video service centre.
Equipment type may include:
digital
IP based
optical:
add/drop multiplexers
amplifiers
filters
receivers
splitters/combiners
switches
transmitters
wireless:
amplifiers
filters
microwave
receivers
RF broadband
satellite
transmitters.
Technologies may include:
digital subscriber lines:
ADSL
DSL
IP broadband:
IPTV
VoIP
WiFI
WiMAX
mobile radio
optical transmission systems:
DWDM systems
WDM systems.
Resources may include:
equipment
hardware
installation platforms
ladders
manpower
materials
safety equipment
software
tools.
Enterprise procedures may include:
asset registration
compliance
preferred suppliers
preferred vendors
procurement agreements
purchase requisition
service level agreements (SLA).
Equipment components may include:
IP based network elements:
gateways
routers
switches
optical devices:
amplifiers
multiplexers
routers
switches
virtual equipment:
networks
private branch exchange (PBX)
simulations
servers.
Access Network deployment rules may relate to:
exemption process criteria
restricted site access:
financial institutions
government offices
rail corridor
research establishments
separation from other services:
electricity
fire equipment
gas
other telecommunications service providers
water.
Monitoring techniques may include use of :
databases:
capacity assessment data
traffic dimensioning data
network performance data
network management system
network management tools.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the ability to:
gather data appropriately within information sources and evaluate how the data relates to the access architecture
source major equipment and technologies used in an access network and detail their compatibilities
plan the deployment of an access network architecture, including deployment rules, capacity and capability management and monitoring techniques
complete work within a timeframe typically expected of the discipline, work function and industrial environment.
Context of and specific resources for assessment
Assessment must ensure:
network design documentation and other site related documentation
equipment specifications
live network or training facilities
organisational guidelines
networked computers
networked telecommunications components.
Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
direct observation of the candidate planning the deployment of an access network architecture
review of reports completed by the candidate for differing access network examples
review of final deployment plan prepared by the candidate outlining recommendations for the customer
oral or written questioning to assess knowledge of equipment and technologies as used within the access network.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, for example:
ICTNPL4109A Evaluate the capability of access networks.

Aboriginal people and other people from a non-English speaking background may have second language issues.

Access must be provided to appropriate learning and assessment support when required.

Assessment processes and techniques must be culturally appropriate, and appropriate to the oral communication skill level, and language and literacy capacity of the candidate and the work being performed.

In all cases where practical assessment is used it will be combined with targeted questioning to assess required knowledge. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency.

Where applicable, physical resources should include equipment modified for people with special needs.
Replaced By
State Code National Code Title Type
AWE46 ICTNPL402 Plan the deployment of access network architectures Unit of competency
State Code National Code Title Type
W810 ICT40510 Certificate IV in Telecommunications Network Planning Qualification