Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Construct access tracks
Construct access tracks
Unit of competency
National Code
AHCLPW303A
AHCLPW303A
State Code
D6894
D6894
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
18/06/2014
Field of Education
040399 - Building, N.e.c.
Original Release Date
18/06/2014
Nominal Hours
50
Description
This unit covers the process of constructing access tracks and clearing vegetation on rural land and defines the standard required to: determine control points; required grades, and water crossing points and structures from field observations; construct tracks utilising industry endorsed earthworks methods and patterns for specific machines; excavate; transport; dump and compact road material; finish track surface; clean worksite.
Notes
Elements and Performance Criteria
1. Prepare for construction of access track
- 1.1. Equipment and attachments are matched to programmed tasks and terrain scheduled on site.
- 1.2. Work readiness of selected equipment is verified in line with contractor policy.
- 1.3. Construction details and sequence are confirmed from supervisor.
- 1.4. Survey pegs and site indicators are identified and located on work site.
- 1.5. Compliance with relevant regulatory planning and environmental legislation are confirmed.
- 1.6. Organisational occupational health&safety procedures, practices policies, and precautions are observed and followed.
- 1.7. Site environmental concerns are adhered to in accordance with relevant national, state, and local legislation and/or regulations.
- 1.8. Determine control points, required grades, and water crossing points and structures from field observations and any available additional information.
- 1.9. Any permits or licences required for the construction are identified, sought and obtained.
- 1.10. People, materials and equipment required for the construction are coordinated and scheduled in accordance with organisation guidelines.
2. Form access track
- 2.1. Industry endorsed earthworks methods and patterns for specific machines are utilised during construction.
- 2.2. Optimum machine loads are monitored and maintained to suit prevailing conditions.
- 2.3. Safe machine operating techniques and procedures are deployed to match terrain, site conditions and other operators or workers.
- 2.4. Excavation, transport, dumping and compaction of material is completed in line with job sequence and endorsed industry practices.
- 2.5. Vegetation is cleared according to enterprise guidelines and industry best practice.
- 2.6. Neighbouring landholders, local authorities and interest groups are liaised with during the construction activity in according to enterprise guidelines and industry best practice.
- 2.7. Documentation required by organisation and/or occupational health&safety guidelines, is completed clearly and accurately.
- 2.8. Operational staff, clients and contractors are communicated with regularly throughout the construction activity to ensure smooth operation and progress.
3. Apply final finish to track
- 3.1. Endorsed industry methods are utilised to surfaces to achieve job requirements.
- 3.2. Site features and vegetation are retained in line with works plan/schedule.
- 3.3. Site is cleared and debris removed in line with contractor policy.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole.
Machinery and activities may include:
all machinery, equipment and processes used in the construction of access tracks and clearing of vegetation.
The range statement relates to the unit of competency as a whole.
Machinery and activities may include:
all machinery, equipment and processes used in the construction of access tracks and clearing of vegetation.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Competence requires evidence that access tracks have been appropriately constructed according to enterprise guidelines, relevant legislation and industry best practice. The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
select and prepare equipment
determine control points, required grades, and water crossing points and structures from field observations
construct tracks utilising industry endorsed earthworks methods and
patterns for specific machines
excavate, transport, dump and compact road material
finish track surface and clean worksite.
Context of and specific resources for assessment
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Competence requires evidence that access tracks have been appropriately constructed according to enterprise guidelines, relevant legislation and industry best practice. The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
select and prepare equipment
determine control points, required grades, and water crossing points and structures from field observations
construct tracks utilising industry endorsed earthworks methods and
patterns for specific machines
excavate, transport, dump and compact road material
finish track surface and clean worksite.
Context of and specific resources for assessment
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| S2612 | RTD3202A | Construct access tracks | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAS28 | AHCLPW303 | Construct access tracks | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J516 | AHC32513 | Certificate III in Aboriginal-sites Work | Qualification |
| D480 | AHC31410 | Certificate III in Conservation and Land Management | Qualification |
| D490 | AHC32310 | Certificate III in Conservation Earthworks | Qualification |
| D481 | AHC31510 | Certificate III in Indigenous Land Management | Qualification |
| D482 | AHC31610 | Certificate III in Lands, Parks and Wildlife | Qualification |