Unit of competency Outline
Date retreived
23/07/2026 2:25 AM AWST
23/07/2026 2:25 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Develop and implement a streetscape management plan
Develop and implement a streetscape management plan
Unit of competency
National Code
AHCPGD504A
AHCPGD504A
State Code
D7120
D7120
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
13/12/2011
Field of Education
040103 - Urban Design And Regional Planning
Original Release Date
13/12/2011
Nominal Hours
30
Description
This unit covers the development and implementation of a streetscape management plan and defines the standard required to: define the need for a management plan; undertake preliminary planning activities; prepare a site description; analyse site information and description; identify management strategies; document the management plan; implement the management plan.
Notes
Elements and Performance Criteria
1. Define the need for a streetscape management plan
- 1.1. Management plan objectives are identified for the streetscape.
- 1.2. Brief is agreed in consultation with client for streetscape.
- 1.3. Planning team including specialists and consultants is identified.
2. Undertake preliminary planning activities
- 2.1. Major stakeholders are identified.
- 2.2. Availability of specialists to assist in management planning work is ascertained and contracts are prepared where required.
- 2.3. Timelines for development of the management plan and reporting arrangements to client are established.
- 2.4. Resources required for the development of management strategies are identified.
3. Prepare a site description
- 3.1. Landscape values of the area are identified and mapped.
- 3.2. Physical features and characteristics of the streetscape are identified and mapped.
- 3.3. Land uses including current, cultural and historical modifications are researched, and their effects on the streetscape are determined and recorded.
- 3.4. Physical condition of site is assessed and documented.
- 3.5. Biological characteristics of the site are documented.
4. Analyse site information and description
- 4.1. Information is evaluated in terms of core principles and objectives.
- 4.2. Documents are produced including plans, technical reports and maps.
- 4.3. Priorities and key management issues are determined.
- 4.4. Opportunities and constraints to meeting planning objectives and goals are identified and documented.
- 4.5. Presentation to clients/residents is undertaken and feedback incorporated into planning documentation.
5. Identify management strategies
- 5.1. Management strategies are identified that address defined objectives.
- 5.2. Management strategies are designed to alleviate existing impacts or to target management action.
- 5.3. Management strategies are costed and compared to existing budgets and available resources.
- 5.4. Implementation of work is planned to prioritise outcomes and management resource allocation.
- 5.5. Consultation with clients/residents is undertaken and feedback incorporated into planning documentation.
6. Prepare the management plan
- 6.1. Site information and management strategies are documented into a draft management plan for consultation.
- 6.2. Consultation with stakeholders and clients is undertaken according to enterprise guidelines.
- 6.3. Changes are made to the draft plan and a final plan is prepared and presented to client.
7. Implement the management plan
- 7.1. Implementation is carried out within predetermined budget, and according to schedule and strategies set out in management plan.
- 7.2. Implementation strategy is modified to address on-going feedback from clients/residents according to enterprise guidelines.
- 7.3. Reports on progress of implementation works are provided to clients/residents as required by the management plan.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole.
Streetscape management may include:
streetscapes
recreation and leisure opportunities
improved lifestyle for residents
safety hazards and risks
protection
conservation and restoration works for key plant species
disease and pest flora and fauna control
nutritional issues
erosion, toxicity repair works
habitat rehabilitation.
The range statement relates to the unit of competency as a whole.
Streetscape management may include:
streetscapes
recreation and leisure opportunities
improved lifestyle for residents
safety hazards and risks
protection
conservation and restoration works for key plant species
disease and pest flora and fauna control
nutritional issues
erosion, toxicity repair works
habitat rehabilitation.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
define the need for a management plan
undertake preliminary planning activities
prepare a site description
analyse site information and description
identify management strategies
document the management plan
implement the management plan.
Context of and specific resources for assessment
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
define the need for a management plan
undertake preliminary planning activities
prepare a site description
analyse site information and description
identify management strategies
document the management plan
implement the management plan.
Context of and specific resources for assessment
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| S3311 | RTF5506A | Develop and implement a streetscape management plan | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAM52 | AHCPGD504 | Develop and implement a streetscape management plan | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D516 | AHC50410 | Diploma of Horticulture | Qualification |
| D519 | AHC50710 | Diploma of Parks and Gardens Management | Qualification |