Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install swimming pool and spa subsoil drainage

Install swimming pool and spa subsoil drainage

Unit of competency
National Code
CPCSPS4003
State Code
OCM18
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
27/11/2020
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040327 - Plumbing
Original Release Date
01/06/2021
Nominal Hours
20
Description
This unit specifies the skills and knowledge required to install subsoil drainage to variously shaped in-ground swimming pools and spas. It includes preparing and installing the drainage during excavation.This reflects the role of those who are responsible for diverting subsoil water away from the swimming pool and spa construction site. It applies to a range of contexts:private swimming poolspublic swimming pools, including:hydrotherapy and therapeutic exercise poolswading and receiving pools associated with water slideswave pools.This unit is suitable for those using specialised knowledge to complete routine and non-routine tasks, and their own judgement to deal with predictable and sometimes unpredictable problems.No licensing or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan the sub-soil drainage.
  • 1.1 Access, read and interpret relevant information from plans, specifications, codes and standards.
  • 1.2 Interpret and apply work health and safety and environmental requirements.
  • 1.3 Locate existing underground services and avoid during excavation and construction works.
  • 1.4 Identify type, dimensions and area of subsoil drainage.
  • 1.5 Calculate and order materials.
  • 1.6 Determine commencement date and schedule delivery of material, components and required plant and equipment.
  • 1.7 Determine job priorities and sequence job tasks in consultation with others on site.
2 Prepare for and install subsoil drainage.
  • 2.1 Set out position and depth of drainage.
  • 2.2 Select, fit and use personal protective equipment appropriate for the activity.
  • 2.3 Conduct a pre-operation check of plant and equipment.
  • 2.4 Excavate trench depth and width to set out position.
  • 2.5 Install and compact specified drainage material to determined levels.
  • 2.6 Install drainage pipework and backfill trenches.
3 Clean up site.
  • 3.1 Clear the work area and reuse, recycle or dispose of materials in accordance with workplace and environmental requirements.
  • 3.2 Clean tools and equipment, check for serviceability, report any damage or faults and store and secure.