Unit of competency Outline
Date retreived
23/07/2026 1:03 PM AWST
23/07/2026 1:03 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Manage network systems power flows
Manage network systems power flows
Unit of competency
National Code
UETTDRSO51
UETTDRSO51
State Code
OBG72
OBG72
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
04/12/2019
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
04/12/2019
Nominal Hours
162
Description
This unit covers the management of electrical network active and reactive power flows ensuring the network is operated within design parameters at all times. The electrical network includes feeders from distribution to transmission voltages, substation and generation assets that can influence power flows.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace subject to regulations for undertaking of electrical work. Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Plan to manage network power flows
- 1.1 Work health and safety (WHS)/occupational health and safety (OHS) practices/procedures and environmental and sustainable energy procedures, which may influence preparation of any network power flow management decisions, are reviewed and determined
- 1.2 Purpose of the management is established after data is analysed and expected outcomes of the work are confirmed with appropriate personnel
- 1.3 Organisational established policies, procedures and specifications for the management of network power flows are obtained or established with appropriate personnel
- 1.4 Network power flow management decisions are discussed with and/or directed to appropriate personnel in order to ascertain the system conditions
- 1.5 Equipment/tools and personal protective equipment (PPE) are selected based on specified performance criteria and established procedures
- 1.6 Work roles and tasks are allocated according to requirements and individual competencies
- 1.7 Work is prioritised and sequenced for the most efficient/effective outcome, completed within an acceptable timeframe, to a quality standard and in accordance with established procedures
- 1.8 Liaison and communication issues with others/authorised personnel, authorities and clients are resolved and activities coordinated to carry out work
- 1.9 Risk control measures are identified, prioritised and evaluated against the work schedule
- 1.10 Need for relevant operating procedures are identified to manage the performance of the network according to requirements and/or established procedures
- 1.11 Circuit/systems modelling is used to evaluate alternative proposals in accordance with established procedures
2 Carry out and management network power flow
- 2.1 Strategic plans are developed incorporating organisational initiatives in accordance with established procedures
- 2.2 WHS/OHS and sustainable energy principles, functionality and practices to reduce the incidents of accidents and minimise waste are incorporated into the project in accordance with requirements and/or established procedures
- 2.3 Management decisions are made on the basis of safety and effective outcomes according to requirements and/or established procedures
- 2.4 Stakeholders/customers are kept informed of current status regarding plan progress and recent developments
- 2.5 Technical advice is given regarding potential hazards, safety risks and control measures so that monitoring and preventative action can be undertaken and/or appropriate authorities consulted, where necessary, in accordance with requirements and established procedures
- 2.6 Essential knowledge and associated skills are applied to analyse specific data and compare it with compliance specifications to ensure completion of the work within an agreed timeframe according to requirements
- 2.7 Testing of management decisions is undertaken according to requirements and established procedures
- 2.8 Work teams/groups are arranged/coordinated/evaluated to ensure planned goals are met according to established procedures
- 2.9 Solutions to non-routine problems are identified and actioned, using acquired essential knowledge and associated skills, according to requirements
- 2.10 Quality of work is monitored against personal performance agreement and/or established organisational and professional standards
3 Complete the management of network power flow
- 3.1 Final review of management decisions is undertaken to ensure it complies with all requirements and includes all specifications and documentations needed to complete the work
- 3.2 Appropriate personnel are notified of completion and reports and/or completion documents (electronic/paper) are finalised/commissioned
- 3.3 Reports and/or completion documents (electronic/paper) are submitted to relevant personnel/organisations for approval and, where applicable, statutory or regulatory approval
- 3.4 Where applicable, approved copies of power flow management documents (electronic/paper) are issued and records are updated in accordance with established procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WD768 | UETTDRSO51A | Manage network systems power flows | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BEW7 | UET60219 | Advanced Diploma of ESI - Power Systems | Qualification |
| BEV7 | UET60319 | Advanced Diploma of ESI - Power Systems Operations | Qualification |