Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install gas pressure control equipment

Install gas pressure control equipment

Unit of competency
National Code
CPCPGS3048
State Code
OCN97
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
27/11/2020
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040327 - Plumbing
Original Release Date
01/06/2021
Nominal Hours
12
Description
This unit specifies the skills and knowledge required to install and commission gas control and regulating equipment for consumer piping carrying natural gas (NG) or liquefied petroleum gas (LPG) up to 200 kPa.In some jurisdictions, this unit of competency may form part of accreditation, licensing, legislative, regulatory or certification requirements.
Notes
Elements and Performance Criteria
1 Identify installation requirements.
  • 1.1 Access, read and determine gas pressure control equipment installation requirements from job specifications, relevant Australian Standards, codes, manufacturer’s specifications and jurisdictional requirements.
  • 1.2 Identify and apply workplace policies and procedures, work health and safety (WHS) and environmental requirements.
2 Prepare for work.
  • 2.1 Identify potential hazards and determine and implement control measures.
  • 2.2 Create a materials list and collect materials.
  • 2.3 Select appropriate tools and equipment including personal protective equipment (PPE).
3 Install and commission equipment.
  • 3.1 Perform installation of pipework, fittings and gas pressure control equipment.
  • 3.2 Test, purge and commission system.
  • 3.3 Adjust gas pressure.
  • 3.4 Complete documentation according to regulatory requirements.
4 Clean up.
  • 4.1 Clear the work area, and dispose of, reuse or recycle materials in accordance with state and territory legislation and workplace policies and procedures.
  • 4.2 Clean tools and equipment, check for serviceability and report any damage, and store and secure.
No information
No information
Replaces
State Code National Code Title Type
WF894 CPCPGS3048A Install gas pressure control equipment Unit of competency
State Code National Code Title Type
BGB7 CPC32720 Certificate III in Gas Fitting Qualification
BGC2 CPC32420 Certificate III in Plumbing Qualification