Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Apply densifiers and sealers to concrete surfaces

Apply densifiers and sealers to concrete surfaces

Unit of competency
National Code
MSFFL3049
State Code
WI406
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
10/12/2013
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
040313 - Ceiling, Wall And Floor Fixing
Original Release Date
19/06/2014
Nominal Hours
20
Description
This unit of competency covers selecting densifying and sealing materials appropriate for the job, preparing for the work and applying the selected materials to concrete floors prior to polishing. It applies to a wide variety of flooring technology operations in an on-site environment and involves application of skills and knowledge at a trade worker level. Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Notes
Elements and Performance Criteria
1 Identify and prepare for work requirements
  • 1.1 Applicable work health and safety (WHS), legislative and organisational requirements relevant to the application of densifiers and sealers are verified and complied with
  • 1.2 Instructions and/or plans are read and interpreted to identify process required to complete work tasks
  • 1.3 Relevant densifying and sealing materials are selected with regard to job requirements, manufacturer recommendations and client expectations
  • 1.4 Selected materials are assessed as being compatible with the surface to be treated
  • 1.5 Application tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  • 1.6 Surface to be densified or sealed is inspected and assessed as being ready for application, with any minor surface imperfections corrected and signs erected to warn others of the application process
  • 1.7 Work sequence is planned to ensure efficiency and quality of application
  • 1.8 WHS requirements, including isolation, ventilation and other personal protection needs, are observed throughout the work
2 Apply densifying or sealing system
  • 2.1 Ventilation is checked before application, and all WHS requirements are met, including use of personal protective equipment
  • 2.2 Environmental protection regulations are complied with
  • 2.3 Surface is wetted and densifier or sealing material is applied in accordance with manufacturer recommendations
  • 2.4 Recommended drying times are observed
  • 2.5 Applied material is checked when dry to ensure it meets the requirements of the job
3 Complete housekeeping
  • 3.1 Unused materials are resealed and stored
  • 3.2 Tools and equipment are cleaned, maintained and stored
  • 3.3 Work area is cleaned and waste material is removed and disposed of safely
  • 3.4 Barriers and signs are removed and stored
  • 3.5 Workplace documentation/reporting is completed
No information
No information
Replaced By
State Code National Code Title Type
OAJ29 MSFFL3100 Apply densifiers and sealers to concrete surfaces Unit of competency
State Code National Code Title Type
J736 MSF30813 Certificate III in Flooring Technology Qualification