Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Design polyethylene plastic pipelines for pressurised applications
Design polyethylene plastic pipelines for pressurised applications
Unit of competency
National Code
PMBWELD306E
PMBWELD306E
State Code
ODA96
ODA96
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
19/05/2021
Field of Education
030305 - Materials Engineering
Original Release Date
19/05/2021
Nominal Hours
20
Description
This unit describes the skills and knowledge required to design and specify appropriate testing and commissioning procedures while under industrial conditions in the field for polyethylene (PE) plastic pressure pipelines. This unit applies to an operator working alone or as part of a team.The unit principally refers to experienced operators who are required to select materials, components and designs for pressure applications of plastic pipelines to requirements, and specify appropriate testing and commissioning with high pressure water.No licensing or certification requirements exist at the time of publication. Relevant legislation, industry standards and codes of practice within Australia must be applied.
Notes
Elements and Performance Criteria
1. Assess suitability of polyethylene pipe materials for specific pressure applications
- 1.1 Identify materials as grades of polyethylene from national standards, job specifications and work site instructions
- 1.2 Determine polyethylene materials properties from national standards and material data sheets
- 1.3 Identify job needs from worksite instructions and job specifications
2. Determine appropriate products from national standards
- 2.1 Identify material options from national standards, supplier data sheets, and government codes and regulations
- 2.2 Identify performance limitations of material options from materials knowledge and data sheets
- 2.3 Identify pipe and component options from national standards, supplier data sheets, and government codes and regulations
- 2.4 Identify performance limitations of pipe and component options from materials knowledge and data sheets
- 2.5 Identify suitable jointing methods for pipes and fittings from jointing knowledge
- 2.6 Identify operational conditions from job specifications and workplace procedures
3. Determine pipeline requirements
- 3.1 Identify length of pipe required from job specifications
- 3.2 Identify type and number of fittings required from job specifications
- 3.3 Select pipe and components in context of specific job needs and product properties
- 3.4 Identify jointing equipment or materials from job specifications
- 3.5 Prepare field operational sheets according to workplace procedures
- 3.6 Adjust the design to meet requirements and quality standards
4. Determine testing and commissioning procedures
- 4.1 Determine specific installation test requirements from job specifications and quality standards
- 4.2 Establish procedures for commissioning of work to be done from job specifications
- 4.3 Accurately maintain records and logbooks
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAH79 | PMBWELD306 | Design polyethylene plastic pressure pipelines | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGP1 | PMB30121 | Certificate III in Polymer Processing | Qualification |