Unit of competency Outline
Date retreived
22/07/2026 9:14 PM AWST
22/07/2026 9:14 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Construct prototypes and samples
Construct prototypes and samples
Unit of competency
National Code
FPITMM4201B
FPITMM4201B
State Code
D6095
D6095
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
23/04/2013
Field of Education
040311 - Carpentry And Joinery
Original Release Date
23/04/2013
Nominal Hours
40
Description
This unit describes the outcomes required to prepare and construct prototypes and samples in line with established plans, drawings or other specifications for the purpose of testing product viability and construction methodsGeneral workplace legislative and regulatory requirements apply to this unit; however there are no specific licensing or certification requirements at the time of publicationThis unit replaces FPITMM4201A Construct prototypes and samples
Notes
Elements and Performance Criteria
1. Prepare for construction
- 1.1. Applicable Occupational Health and Safety (OHS), environmental, legislative and organisational requirements relevant to constructing prototypes and samples are identified and followed
- 1.2. Prototype purpose, workorder and construction plans are produced and checked with appropriatepersonnel
- 1.3. Type and quantity of material and assemblyhardware to be constructed are collected
- 1.4. Equipment is selected appropriate to work requirements and checked for operational effectiveness in line with manufacturer's recommendations
- 1.5. Stages of the construction process are planned and documented
- 1.6. Communication with others is established and maintained in line with OHS requirements
2. Set up components
- 2.1. Set-up jigs required for construction are specified and prepared
- 2.2. Timbercomponents are selected, checked for compatibility with the specifications and cut in line with the prototype plans
- 2.3. Components are positioned and clamped in jigs ready for joining with allowable faults, joins and grain in line with construction standards and grading rules
- 2.4. Defectivecomponents are rejected and disposed of in line with site procedures and environmental requirements
- 2.5. Timber that is cut incorrectly and off-cuts are disposed of in line with site procedures and environmental requirements
- 2.6. Components are stapled to maintain temporary alignment during construction
3. Construct prototype
- 3.1. Construction plan is followed to construct the item
- 3.2. Assembly hardware is located and selected in line with the prototype construction plans and specifications
- 3.3. Checks are conducted at designated points in construction
- 3.4. Hardware is positioned on joints and installed, following prototype specifications
- 3.5. Temporary bracing is nailed or stapled to the product in line with construction standards
- 3.6. Modifications to designs and plans are detected and recommended within workplace procedures
- 3.7. Construction faults are corrected and prototype plans modified
- 3.8. Modifications to the plan are documented and followed
- 3.9. Prototype or sample is checked for effectiveness and timeliness of construction to suit the purpose
- 3.10. Prototype development processes and problems are recorded and reported to the appropriate personnel
- 3.11. When no longer required, temporary bracing, prototypes and samples are stored or disposed of in line with site procedures and environmental requirements
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
OHSrequirements:
are to be in line with applicable Commonwealth, State or Territory legislation and regulations, and organisational safety policies and procedures, and may include:
personal protective equipment and clothing
safety equipment
first aid equipment
fire fighting equipment
hazard and risk control
fatigue management
elimination of hazardous materials and substances
safe forest practices including required actions relating to forest fire
manual handling including shifting, lifting and carrying
Environmental requirements may include:
legislation
organisational policies and procedures
workplace practices
Legislative requirements:
are to be in line with applicable Commonwealth, State or Territory legislation, regulations, certification requirements and codes of practice and may include:
award and enterprise agreements
industrial relations
Australian Standards
confidentiality and privacy
OHS
the environment
equal opportunity
anti-discrimination
relevant industry codes of practice
duty of care
Organisational requirements may include:
legal
organisational and site guidelines
policies and procedures relating to own role and responsibility
quality assurance
procedural manuals
quality and continuous improvement processes and standards
OHS, emergency and evacuation procedures
ethical standards
recording and reporting requirements
equipment use and maintenance and storage requirements
environmental management requirements (waste minimisation and disposal, recycling and re-use guidelines)
Prototypes may include:
new designs for:
pallets
crates
trellises
trusses
stairs
doors
windows
frames
beams
new product development
Workorder is to include:
instructions for the construction and testing of new timber products from the work site
and may include:
construction plans or drawings
type of product
size
quantity
grade
instructions for the environmental monitoring of work and procedures
environmental care requirements relevant to the work
Appropriatepersonnel may include:
supervisors
suppliers
clients
colleagues
managers
Material may include:
native timber species
imported timber species
dressed timber
in-the-rough timber
stress and non-stress graded timber
preservative treated timber
medium density fibreboard
laminated veneer
chipboard,
fibreboard and other manufactured board products
coated and/or treated timber products
beams or laminated beams
Assembly hardware is to include:
nailing plates
and may include:
gang nails
nail gun nails
staples
Equipment may include:
measuring equipment
assembly jigs
nail plate presses
staple guns
nail guns
compressor or compressed air supply
marking equipment
strapping equipment
Stages
are the development phases of the new prototype, allowing review for each process and modification
Communication may include:
verbal and non-verbal language
constructive feedback
active listening
questioning to clarify and confirm understanding
use of positive, confident and cooperative language
use of language and concepts appropriate to individual social and cultural differences
control of tone of voice and body language
Set-up jigs
are the organisation's manufactured templates which assist in the positioning of components during the assembly process
are usually newly developed as part of the prototype development process
Timbercomponents
are the sections of timber or timber product which are cut in readiness for assembly and have been cut to follow the construction plans and specifications
Defectivecomponents may include:
components with an unacceptable level of :
warp
wane
cupping
shakes
insect defects
knots
resin pockets
Disposing of may include:
recycling material with defective components; timber that is cut incorrectly, off-cuts; temporary bracing, prototypes or samples no longer required
re-using material with defective components; timber that is cut incorrectly, off-cuts; temporary bracing, prototypes or samples no longer required
Temporarybracing
may be fixed to secure the assembled product in alignment and square during transportation, moving and positioning on site
Modifications may include:
changing aspects of the prototype plans, drawings and specifications to facilitate acceptable construction methods, standard component sizes or to rectify and overcome a construction fault
Construction faults may include:
incorrectly positioned joints
timber splits from nailing
incorrectly positioned hardware
Records and reports may include:
product type
size
inspection
grading and labelling outcomes
storage locations
quality outcomes
hazards
incidents
equipment malfunctions
and may be:
manual
using a computer-based system or another appropriate organisational communication system
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
OHSrequirements:
are to be in line with applicable Commonwealth, State or Territory legislation and regulations, and organisational safety policies and procedures, and may include:
personal protective equipment and clothing
safety equipment
first aid equipment
fire fighting equipment
hazard and risk control
fatigue management
elimination of hazardous materials and substances
safe forest practices including required actions relating to forest fire
manual handling including shifting, lifting and carrying
Environmental requirements may include:
legislation
organisational policies and procedures
workplace practices
Legislative requirements:
are to be in line with applicable Commonwealth, State or Territory legislation, regulations, certification requirements and codes of practice and may include:
award and enterprise agreements
industrial relations
Australian Standards
confidentiality and privacy
OHS
the environment
equal opportunity
anti-discrimination
relevant industry codes of practice
duty of care
Organisational requirements may include:
legal
organisational and site guidelines
policies and procedures relating to own role and responsibility
quality assurance
procedural manuals
quality and continuous improvement processes and standards
OHS, emergency and evacuation procedures
ethical standards
recording and reporting requirements
equipment use and maintenance and storage requirements
environmental management requirements (waste minimisation and disposal, recycling and re-use guidelines)
Prototypes may include:
new designs for:
pallets
crates
trellises
trusses
stairs
doors
windows
frames
beams
new product development
Workorder is to include:
instructions for the construction and testing of new timber products from the work site
and may include:
construction plans or drawings
type of product
size
quantity
grade
instructions for the environmental monitoring of work and procedures
environmental care requirements relevant to the work
Appropriatepersonnel may include:
supervisors
suppliers
clients
colleagues
managers
Material may include:
native timber species
imported timber species
dressed timber
in-the-rough timber
stress and non-stress graded timber
preservative treated timber
medium density fibreboard
laminated veneer
chipboard,
fibreboard and other manufactured board products
coated and/or treated timber products
beams or laminated beams
Assembly hardware is to include:
nailing plates
and may include:
gang nails
nail gun nails
staples
Equipment may include:
measuring equipment
assembly jigs
nail plate presses
staple guns
nail guns
compressor or compressed air supply
marking equipment
strapping equipment
Stages
are the development phases of the new prototype, allowing review for each process and modification
Communication may include:
verbal and non-verbal language
constructive feedback
active listening
questioning to clarify and confirm understanding
use of positive, confident and cooperative language
use of language and concepts appropriate to individual social and cultural differences
control of tone of voice and body language
Set-up jigs
are the organisation's manufactured templates which assist in the positioning of components during the assembly process
are usually newly developed as part of the prototype development process
Timbercomponents
are the sections of timber or timber product which are cut in readiness for assembly and have been cut to follow the construction plans and specifications
Defectivecomponents may include:
components with an unacceptable level of :
warp
wane
cupping
shakes
insect defects
knots
resin pockets
Disposing of may include:
recycling material with defective components; timber that is cut incorrectly, off-cuts; temporary bracing, prototypes or samples no longer required
re-using material with defective components; timber that is cut incorrectly, off-cuts; temporary bracing, prototypes or samples no longer required
Temporarybracing
may be fixed to secure the assembled product in alignment and square during transportation, moving and positioning on site
Modifications may include:
changing aspects of the prototype plans, drawings and specifications to facilitate acceptable construction methods, standard component sizes or to rectify and overcome a construction fault
Construction faults may include:
incorrectly positioned joints
timber splits from nailing
incorrectly positioned hardware
Records and reports may include:
product type
size
inspection
grading and labelling outcomes
storage locations
quality outcomes
hazards
incidents
equipment malfunctions
and may be:
manual
using a computer-based system or another appropriate organisational communication system
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
A person who demonstrates competency in this unit must be able to provide evidence that they can safely and efficiently construct prototypes and samples within organisational requirements
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to and satisfy all of the requirements of the elements of this unit and include demonstration of:
following applicable Commonwealth, State or Territory legislative and regulatory requirements and codes of practice relevant to constructing prototypes and samples
following organisational policies and procedures relevant to constructing prototypes and samples
effective communication and safe working practices
constructing prototypes and samples in line with construction plans, drawings and specifications to follow construction standards
assessing prototype success with accepted development times, organisational production procedures and product purpose
Context of and specific resources for assessment
Competency is to be assessed in the workplace or realistically simulated workplace
Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints
Assessment of required knowledge, other than confirmatory questions, will usually be conducted in an off-site context
Assessment is to follow relevant regulatory or Australian Standards requirements
The following resources should be made available:
workplace location or simulated workplace
materials and equipment relevant to undertaking work applicable to this unit
specifications and work instructions
Method of assessment
Assessment must satisfy the endorsed Assessment Guidelines of the FPI11 Training Package
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of required knowledge
Assessment must be by direct observation of tasks, with questioning on required knowledge and it must also reinforce the integration of employability skills
Assessment methods must confirm the ability to access and correctly interpret and apply the required knowledge
Assessment may be applied under project-related conditions (real or simulated) and require evidence of process
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances
Assessment may be in conjunction with assessment of other units of competency
The assessment environment should not disadvantage the candidate
Assessment practices should take into account any relevant language or cultural issues related to Aboriginality, gender or language backgrounds other than English
Where the participant has a disability, reasonable adjustment may be applied during assessment
Language and literacy demands of the assessment task should not be higher than those of the work role
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
A person who demonstrates competency in this unit must be able to provide evidence that they can safely and efficiently construct prototypes and samples within organisational requirements
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to and satisfy all of the requirements of the elements of this unit and include demonstration of:
following applicable Commonwealth, State or Territory legislative and regulatory requirements and codes of practice relevant to constructing prototypes and samples
following organisational policies and procedures relevant to constructing prototypes and samples
effective communication and safe working practices
constructing prototypes and samples in line with construction plans, drawings and specifications to follow construction standards
assessing prototype success with accepted development times, organisational production procedures and product purpose
Context of and specific resources for assessment
Competency is to be assessed in the workplace or realistically simulated workplace
Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints
Assessment of required knowledge, other than confirmatory questions, will usually be conducted in an off-site context
Assessment is to follow relevant regulatory or Australian Standards requirements
The following resources should be made available:
workplace location or simulated workplace
materials and equipment relevant to undertaking work applicable to this unit
specifications and work instructions
Method of assessment
Assessment must satisfy the endorsed Assessment Guidelines of the FPI11 Training Package
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of required knowledge
Assessment must be by direct observation of tasks, with questioning on required knowledge and it must also reinforce the integration of employability skills
Assessment methods must confirm the ability to access and correctly interpret and apply the required knowledge
Assessment may be applied under project-related conditions (real or simulated) and require evidence of process
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances
Assessment may be in conjunction with assessment of other units of competency
The assessment environment should not disadvantage the candidate
Assessment practices should take into account any relevant language or cultural issues related to Aboriginality, gender or language backgrounds other than English
Where the participant has a disability, reasonable adjustment may be applied during assessment
Language and literacy demands of the assessment task should not be higher than those of the work role
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| S4767 | FPITMM4201A | Construct prototypes and samples | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AXJ65 | FWPTMM4201 | Construct prototypes and samples | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J475 | FPI40211 | Certificate IV in Timber Processing | Qualification |
| J477 | FPI40411 | Certificate IV in Timber Truss and Frame Design | Qualification |
| S673 | FPI40410 | Certificate IV in Timber Truss and Frame Design | Qualification |
| J476 | FPI40311 | Certificate IV in Timber Truss and Frame Manufacture | Qualification |