Unit of competency Outline

Date retreived
24/07/2026 4:56 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Produce HVAC/R system design drawings

Produce HVAC/R system design drawings

Unit of competency
National Code
UEERA0061
State Code
OBZ99
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
05/10/2020
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031315 - Refrigeration And Air Conditioning Mechanics
Original Release Date
12/07/2021
Nominal Hours
72
Description
This unit involves the skills and knowledge required to produce heating, ventilation and air conditioning/refrigeration (HVAC/R) system design drawings.It includes applying safe working practices, interpreting technical data and specifications, applying knowledge of HVAC/R systems design drawing protocols, using appropriate drawing tools and documenting design.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to produce HVAC/R design drawings
  • 1.1 Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and applied
  • 1.2 WHS/OHS risk control measures and workplace procedures in preparation for the work are followed
  • 1.3 Scope of work is determined from project specifications and/or discussions with relevant person/s
  • 1.4 Relevant person/s is consulted to ensure the work is coordinated effectively with others involved on the worksite
  • 1.5 Software tools and equipment required for work are obtained in accordance with workplace procedures
2 Produce HVAC/R design drawings
  • 2.1 WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
  • 2.2 Relevant design drawings and layouts required are determined in accordance with project specifications
  • 2.3 Technical data of system components is interpreted to determine parameters for inclusion in accordance with project specifications
  • 2.4 Relevant software tools are used to produce drawings in accordance with project specifications
  • 2.5 Drawings are checked for accuracy in accordance with project specifications and workplace procedures
  • 2.6 Methods for dealing with unplanned events are conducted in accordance with workplace procedures and safe work practices
3 Complete and report HVAC/R design drawings
  • 3.1 Completed drawings are submitted to relevant person/s for accuracy in accordance with project specifications and workplace procedures
  • 3.2 Alterations, additions and/or corrective instructions are followed and drawings are re-submitted for final approval in accordance with project specifications and workplace procedures
  • 3.3 Copies of completed drawings are filed in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
S7363 UEENEEJ128A Produce HVAC/R system design drawings Unit of competency