Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install and commission plant, machinery and services
Install and commission plant, machinery and services
Unit of competency
National Code
RIISAM310A
RIISAM310A
State Code
WB468
WB468
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
28/11/2011
Field of Education
030717 - Plant And Machine Operations
Original Release Date
28/11/2011
Nominal Hours
60
Description
This unit covers installing and commissioning of plant, machinery and services in the metalliferous mining and extractive industries. It includes: identifying the plant, machinery and services need; selecting plant, machinery and services delivery equipment; installing plant, machinery and services; and commissioning plant, machinery and services.
Notes
Elements and Performance Criteria
1. Identify plant, machinery and services need
- 1.1. Access, interpret and apply compliance documentation relevant to the installing and commissioning of plant, machinery and services
- 1.2. Access and clarify the site's requirements and procedures relevant to the acquisition of plant, machinery and services equipment
- 1.3. Seek input and advice from relevant parties to assist in the identification of appropriate type of plant, machinery and services equipment
- 1.4. Identify parameters to be applied in the selection of the plant, machinery and services equipment based on relevant requirements
- 1.5. Draw up specifications for plant, machinery and services equipment that meet the requirements of the identified parameters and are in accordance with relevant legislative and mine requirements
2. Select plant, machinery and mine services delivery equipment
- 2.1. Identify options that meet the selection parameters
- 2.2. Gather, validate and assess the data on the various options relevant to the selection parameters
- 2.3. Analyse the various options and select the options that best meet the required parameters
- 2.4. Procure/obtain and organise delivery of plant, machinery and mine services delivery equipment to the mine-site
3. Install plant, machinery and services
- 3.1. Obtain, transport and prepare materials and resources required for installation in accordance with plans and relevant manufacturer's or site requirements
- 3.2. Coordinate activities with relevant parties at the site prior to commencement of, and during installation and commissioning
- 3.3. Apply and monitor isolation procedures to establish and maintain a safe work environment throughout installation activities
- 3.4. Install plant, machinery and services in accordance with manufacturer/supplier specifications, mine procedures and safety requirements
- 3.5. Recognise and respond to hazardous and emergency situations in accordance with manufacturer's instructions and site procedures
- 3.6. Perform installation work in accordance with agreed plan and outcomes and within the operating capacities of the plant, machinery and services
4. Commission plant, machinery and services
- 4.1. Carry out inspection of installed plant and machinery to ensure that it complies with relevant technical specifications and safety requirements
- 4.2. Carry out pre-start checks according to plant and machinery configurations and system requirements
- 4.3. Test and test run plant and machinery to ensure compliance with manufacturer/supplier instructions and site mine operational requirements
- 4.4. Configure and test the operation and capacity of mine services delivery equipment/lines
- 4.5. Return plant and machinery to service in accordance with site procedures and practices and environmental requirements
- 4.6. Develop and document plant and machinery inspection and maintenance schedules in accordance with manufacturer/supplier instructions
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevant compliance documentation
may include:
legislative, organisation and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
code of practice
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Plant and machinery may include:
hydraulic and pneumatic plant
hoisting plant and equipment
extraction plant and machinery
compressors
agitators
conveyors
electric motors
internal combustion engines
generators
ventilation plant, equipment and devices
drilling equipment
equipment guards
Services may include:
water pipes and accessories
compressed air lines and accessories
hydraulic lines and accessories
pneumatic lines and accessories
electric cabling and accessories
communication wires and accessories
Site requirements and procedures may include:
risk management
statutory compliance
development approval, mining licences (or equivalent)
OHS
environmental
quality
purchasing
capital expenditure
contract management
administration (including records and reports)
Relevant parties may include:
contractors
mine personnel
trades people
plant and machinery manufacturers and suppliers
service providers
utilities suppliers
regulatory bodies
safety advisers
Parameters may include:
physical size
operating capacity
other performance criteria
quality criteria
occupational health, safety and environmental features required
compatibility with existing plant and equipment
capital cost limitation
ownership cost
operating cost targets
nominated suppliers
product support requirements
training to be provided by supplier
maximum downtime requirements
Relevant requirements may include:
market considerations
operational considerations
compatibility with existing plant and equipment
capital cost limitations
limitations on downtime
approved suppliers
Coordination may include:
planning activities
setting priorities for activities
establishing liaison channels with other personnel, neighbouring mines, and regulatory bodies
ensuring work and safety requirements are passed to and reinforced with safety, and operational personnel and contractors
Pre-start checks may include:
availability of equipment
detection of conditions that are unusual
fluid levels
job requirements
plant and machinery inspections
personnel availability
equipment status
Relevant compliance documentation
may include:
legislative, organisation and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
code of practice
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Plant and machinery may include:
hydraulic and pneumatic plant
hoisting plant and equipment
extraction plant and machinery
compressors
agitators
conveyors
electric motors
internal combustion engines
generators
ventilation plant, equipment and devices
drilling equipment
equipment guards
Services may include:
water pipes and accessories
compressed air lines and accessories
hydraulic lines and accessories
pneumatic lines and accessories
electric cabling and accessories
communication wires and accessories
Site requirements and procedures may include:
risk management
statutory compliance
development approval, mining licences (or equivalent)
OHS
environmental
quality
purchasing
capital expenditure
contract management
administration (including records and reports)
Relevant parties may include:
contractors
mine personnel
trades people
plant and machinery manufacturers and suppliers
service providers
utilities suppliers
regulatory bodies
safety advisers
Parameters may include:
physical size
operating capacity
other performance criteria
quality criteria
occupational health, safety and environmental features required
compatibility with existing plant and equipment
capital cost limitation
ownership cost
operating cost targets
nominated suppliers
product support requirements
training to be provided by supplier
maximum downtime requirements
Relevant requirements may include:
market considerations
operational considerations
compatibility with existing plant and equipment
capital cost limitations
limitations on downtime
approved suppliers
Coordination may include:
planning activities
setting priorities for activities
establishing liaison channels with other personnel, neighbouring mines, and regulatory bodies
ensuring work and safety requirements are passed to and reinforced with safety, and operational personnel and contractors
Pre-start checks may include:
availability of equipment
detection of conditions that are unusual
fluid levels
job requirements
plant and machinery inspections
personnel availability
equipment status
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for installing and commissioning plant, machinery and services
implementation of requirements, procedures and techniques for the safe, effective and efficient installation and commissioning of plant, machinery and services
working with others to install and commission plant, machinery and services that meet all of the required outcomes
consistent timely installation and commissioning of plant, machinery and services that safely, effectively and efficiently meets the required outcomes
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Assessment of this competency requires typical resources normally used in the work environment. Selection and use of resources for particular worksites may differ due to site circumstances.
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistently achieving the required outcomes
first hand testimonial evidence of the candidate's:
working with others to install and commission small mine plant, machinery and services
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for installing and commissioning plant, machinery and services
implementation of requirements, procedures and techniques for the safe, effective and efficient installation and commissioning of plant, machinery and services
working with others to install and commission plant, machinery and services that meet all of the required outcomes
consistent timely installation and commissioning of plant, machinery and services that safely, effectively and efficiently meets the required outcomes
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Assessment of this competency requires typical resources normally used in the work environment. Selection and use of resources for particular worksites may differ due to site circumstances.
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate's required knowledge
observed, documented and/or first hand testimonial evidence of the candidate's:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistently achieving the required outcomes
first hand testimonial evidence of the candidate's:
working with others to install and commission small mine plant, machinery and services
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH675 | RIISAM310D | Install and commission plant, machinery and services | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D586 | RII30611 | Certificate III in Small Mining Operations | Qualification |