Unit of competency Outline

Date retreived
22/07/2026 5:54 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Operate air conditioning plant

Operate air conditioning plant

Unit of competency
National Code
UEPOPS069
State Code
ODY42
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
20/04/2022
State Implementation and Classification
Approved Date
14/04/2023
Field of Education
030717 - Plant And Machine Operations
Original Release Date
14/04/2023
Nominal Hours
27
Description
This unit involves the skills and knowledge required to operate and inspect an air conditioning plant.Air conditioning in power generation facilities refers to systems that cool air and remove humidity from areas filled with heat producing plant and equipment. A complete system of heating, ventilation, and air conditioning is referred to as heating, ventilation and air conditioning (HVAC).Competency in this unit requires the ability to plan and prepare work; operate, test, analyse and report on air conditioning plant and complete all documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator.Power generation plant operators are trained and authorised to isolate, prepare plant and issue permits to work.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and prepare work
  • 1.1 Work health and safety (WHS)/occupational health and safety (OHS) regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, environmental requirements and workplace procedures are identified, applied and monitored
  • 1.2 Work requirements are identified from relevant personnel and documentation in accordance with workplace procedures
  • 1.3 Documentation to determine air conditioning plant status is assessed and evaluated in accordance with workplace procedures
  • 1.4 Inspection for service is carried out in accordance with site requirements workplace procedures
  • 1.5 Air conditioning plant operational prerequisites are established in accordance with manufacturers’ recommendations and specifications, and workplace procedures
  • 1.6 Sequence for recommissioning of air conditioning plant is determined in accordance with workplace procedures
2 Conductoperation of air conditioning plant
  • 2.1 Air conditioning plant is operated in accordance with manufacturers’ recommendations and specifications, and workplace procedures
  • 2.2 Air conditioning plant is monitored and observed to detect deviations from normal operating conditions in accordance with workplace procedures
  • 2.3 Corrective actions are taken to rectify air conditioning plant abnormalities in accordance with workplace procedures
  • 2.4 Air conditioning plant to be removed from service is identified and removed in accordance with workplace procedures
  • 2.5 Corrective actions are taken when abnormalities are identified during removal of air conditioning plant from service in accordance with workplace procedures
3 Testplant operation
  • 3.1 Tests are performed on air conditioning plant in accordance with workplace procedures
  • 3.2 Air conditioning plant is observed for operational response in accordance with workplace procedures
  • 3.3 Air conditioning plant is returned to required operational status upon completion of testing in accordance with workplace procedures
4 Analyse plant faults
  • 4.1 Causes of abnormal air conditioning plant operating conditions are identified by analysing technical and operational information in accordance with workplace procedures
  • 4.2 Air conditioning plant integrity and personnel safety is maintained through consultation with relevant personnel and technical and operational documentation in accordance with workplace procedures
5 Monitor and inspect plant
  • 5.1 Air conditioning plant to be monitored or inspected is physically identified in accordance with workplace procedures
  • 5.2 Air conditioning plant is monitored and/or inspected for normal operation and to detect deviations in accordance with workplace procedures
  • 5.3 Relevant personnel are notified when defects are detected in accordance with workplace procedures
6 Complete documentation
  • 6.1 Air conditioning plant problems, movements and status are reported in accordance with workplace procedures
  • 6.2 Documentation is updated in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
OAH29 UEPOPS243 Operate air conditioning plant Unit of competency
State Code National Code Title Type
BHQ6 UEP20122 Certificate II in ESI Generation - Operations Support Qualification