Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Apply quick changeover procedures
Apply quick changeover procedures
Unit of competency
National Code
ICPSU357B
ICPSU357B
State Code
D0520
D0520
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
30/11/2007
Field of Education
080307 - Organisation Management
Original Release Date
30/11/2007
Nominal Hours
20
Description
Notes
Elements and Performance Criteria
No information
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Changeover
Changeover may refer to an exchange of dies / tools (traditional), or a change between batches, or it may be any quantum equipment / process change to produce a different product eg plate changeover, stock change
This unit may not be applicable to a totally continuous operation producing only the one product or simultaneous range of products. This is not applicable to a maintenance / PVI shutdown as experienced by continuous process manufacturers
Procedures
Procedures includes all work instructions, standard operating procedures, formulas / recipes, batch sheets, temporary instructions and similar instructions provided for the smooth running of the plant. They may be written, oral, computer-based or in some other form
SMED
Changeover is sometimes referred to as SMED which is a more extreme form where SMED is an abbreviation for Single Minute Exchange of Die; literally, changing a die on a forming or stamping machine in a minute or less; broadly, the ability to perform any set up activity in a minute or less of machine or process downtime. The key to doing this is frequently the capability to convert internal set up time to external set up time. Variations on SMED include:
Single-digit set up: performing a set up activity in a single-digit number of minutes, ie fewer than ten
OTED: One touch exchange of die; literally, changing a die with one physical motion such as pushing a button; broadly, an extremely simple procedure for performing a set up activity
Set up time
Set up time - work required to change over a machine or process from one item or operation to the next item or operation. It can be divided into two types:
internal set up work that can be done only when the machine or process is not actively engaged in production; OR
external set up work that can be done concurrently with the machine or process performing production duties
Changeover
Changeover may refer to an exchange of dies / tools (traditional), or a change between batches, or it may be any quantum equipment / process change to produce a different product eg plate changeover, stock change
This unit may not be applicable to a totally continuous operation producing only the one product or simultaneous range of products. This is not applicable to a maintenance / PVI shutdown as experienced by continuous process manufacturers
Procedures
Procedures includes all work instructions, standard operating procedures, formulas / recipes, batch sheets, temporary instructions and similar instructions provided for the smooth running of the plant. They may be written, oral, computer-based or in some other form
SMED
Changeover is sometimes referred to as SMED which is a more extreme form where SMED is an abbreviation for Single Minute Exchange of Die; literally, changing a die on a forming or stamping machine in a minute or less; broadly, the ability to perform any set up activity in a minute or less of machine or process downtime. The key to doing this is frequently the capability to convert internal set up time to external set up time. Variations on SMED include:
Single-digit set up: performing a set up activity in a single-digit number of minutes, ie fewer than ten
OTED: One touch exchange of die; literally, changing a die with one physical motion such as pushing a button; broadly, an extremely simple procedure for performing a set up activity
Set up time
Set up time - work required to change over a machine or process from one item or operation to the next item or operation. It can be divided into two types:
internal set up work that can be done only when the machine or process is not actively engaged in production; OR
external set up work that can be done concurrently with the machine or process performing production duties
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency
Evidence of the following is essential:
Routine positive participation in quick changeover procedures
Assessment will need to occur in an organisation using quick changeover or a suitable simulation in say a workshop
Context of and specific resources for assessment
Assessment must ensure:
assessment may take place on the job, off the job or a combination of these. Off the job assessment must be undertaken in a closely simulated workplace environment
machinery for changeover
Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
direct questioning combined with review of portfolios of evidence and third party workplace reports of on-the-job performance by the candidate.
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended.
Critical aspects for assessment and evidence required to demonstrate competency
Evidence of the following is essential:
Routine positive participation in quick changeover procedures
Assessment will need to occur in an organisation using quick changeover or a suitable simulation in say a workshop
Context of and specific resources for assessment
Assessment must ensure:
assessment may take place on the job, off the job or a combination of these. Off the job assessment must be undertaken in a closely simulated workplace environment
machinery for changeover
Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
direct questioning combined with review of portfolios of evidence and third party workplace reports of on-the-job performance by the candidate.
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| C8620 | ICPSU357A | Apply quick changeover procedures | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| D3270 | ICPSU357C | Apply quick changeover procedures | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| C825 | ICP20405 | Certificate II in Printing and Graphic Arts (Print Production Support) | Qualification |
| C837 | ICP30505 | Certificate III in Printing and Graphic Arts (Printing) | Qualification |