Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Check and repair points and crossings

Check and repair points and crossings

Unit of competency
National Code
TLIB3095
State Code
AVK44
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
29/01/2021
State Implementation and Classification
Approved Date
23/02/2016
Field of Education
039907 - Rail Operations
Original Release Date
23/02/2016
Nominal Hours
40
Description
This unit involves the skills and knowledge required to check and repair points and crossings in accordance with rail industry standards, safeworking and regulatory requirements, and workplace procedures.It includes determining job requirements, maintaining components and tolerances, installing components, conducting post-installation checks and completing required documentation.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Work is performed under some supervision, generally within a team environment. It involves the application of routine operational principles and procedures when checking and repairing points and crossings, as part of workplace activities across a variety of operational contexts within the Australian rail system.Operators of mechanised equipment must have undertaken training and, where appropriate, hold the relevant licence, permit or certificate and be recognised as competent for the class of machinery being used.
Notes
Elements and Performance Criteria
1 Determine job requirements
  • 1.1 Faults and deficiencies in points and crossings are identified and work required to restore track to required standard is determined
  • 1.2 Hazards are identified, risks are assessed and control measures are implemented
  • 1.3 Repair methods are appropriately identified to enable repairs to be made
  • 1.4 Job requirements are determined in accordance with workplace procedures, and scope of work activities and resources required are identified
2 Maintain components and tolerances
  • 2.1 Clearances are adjusted to specifications to ensure correct functioning
  • 2.2 Wearing surfaces are cleaned and lubricated as required to minimise wear and ensure correct functioning
3 Install components
  • 3.1 New components are prepared to specifications ready for installation
  • 3.2 Tools and equipment required for installation are identified and accessed
  • 3.3 New and replacement components are installed in accordance with rail industry standards and workplace procedures
4 Conduct post-installation checks
  • 4.1 Functional checks are carried out to ensure correct operation
  • 4.2 Completed work is checked for compliance to acceptance standards in accordance with workplace procedures
  • 4.3 Operating conditions are applied appropriately, in accordance with workplace procedures
5 Complete documentation
  • 5.1 Required documentation procedures and processes are confirmed
  • 5.2 Documentation is filled in legibly and proofread
  • 5.3 Documentation is processed in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
D4997 TLIB3095A Check and repair points and crossings Unit of competency