Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Operate glass finishing equipment
Operate glass finishing equipment
Unit of competency
National Code
PMC552048C
PMC552048C
State Code
WA934
WA934
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
15/08/2014
Field of Education
030717 - Plant And Machine Operations
Original Release Date
15/08/2014
Nominal Hours
40
Description
This unit of competency covers the preparation and operation of glass finishing equipment. It involves setting up and monitoring process operation, undertaking changeovers, making adjustments and rectifying routine problems.
Notes
Elements and Performance Criteria
1. Prepare the glass finishing equipment for production
- 1.1. Set up line/equipment in accordance with job specifications
- 1.2. Transfer glass to conveyor
- 1.3. Conduct pre-startup procedure and visual checks according to enterprise procedure checklist
- 1.4. Set up and configure finishing equipment/materials to ensure startup function complies with standard operating procedures
- 1.5. Load and separate glass in accordance with work instructions
2. Operate glass finishing equipment
- 2.1. Identify customer requirements and set minimum parameters in accordance with enterprise standards
- 2.2. Start up equipment in accordance with work instructions
- 2.3. Ensure glass finishing equipment is operated in accordance with established enterprise procedures/work instructions
3. Monitor and record glass finishing equipment operation
- 3.1. Monitor equipment performance in accordance with work instructions and manufacturer's specifications
- 3.2. Monitor non-conforming product against customer specifications
- 3.3. Adjust and control equipment/material to ensure correct product quality in accordance with company requirements
- 3.4. Complete final inspection checks according to enterprise standards
- 3.5. Complete appropriate records and logs according to enterprise standards
4. Rectify routine problems
- 4.1. Identify the range of faults that can occur during the operation
- 4.2. Determine and rectify fault causes in accordance with procedures
- 4.3. Identify and rectify equipment failure causes in accordance with procedures
- 4.4. Make sure appropriate records and log books of equipment operations are maintained to meet procedures
- 4.5. Identify non-routine problems and report to designated person
5. Shut down equipment
- 5.1. Ensure line/equipment is clear of all product and left in a safe manner for startup
- 5.2. Shut down equipment in accordance with work instructions
- 5.3. Complete appropriate records and logs
- 5.4. Shut down equipment in an emergency situation
6. Control hazards
- 6.1. Identify hazards from the job to be done
- 6.2. Identify other hazards in the work area
- 6.3. Assess the risks arising from those hazards
- 6.4. Implement measures to control those risks in line with procedures
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Procedures
All operations are performed in accordance with standard procedures and work instructions
Finishing equipment
This unit includes finishing equipment applicable to each of the specific areas of glass products manufacture. These may include:
flat glass
insulation, glass wool insulation, laminated blankets, roll and boards
fibreglass and glass filaments
packaging, bottles and jars
laminated/toughened glass
automotive glass
Equipment
Equipment may include:
cutting/breakout and drilling
trimming and packing
lathes
etching/surface coating/ treatment equipment
wide line equipment
laminating line equipment
rigid pipeline
measuring recording equipment
choppers
winding machines
ovens
edge working machinery
creel
on-line cutting
communication equipment
computers
Typical problems
Typical problems may include:
process problems
equipment problems
quality problems
OHS
All operations are subject to stringent OHS requirements and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and OHS requirements, the OHS requirements take precedence
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Procedures
All operations are performed in accordance with standard procedures and work instructions
Finishing equipment
This unit includes finishing equipment applicable to each of the specific areas of glass products manufacture. These may include:
flat glass
insulation, glass wool insulation, laminated blankets, roll and boards
fibreglass and glass filaments
packaging, bottles and jars
laminated/toughened glass
automotive glass
Equipment
Equipment may include:
cutting/breakout and drilling
trimming and packing
lathes
etching/surface coating/ treatment equipment
wide line equipment
laminating line equipment
rigid pipeline
measuring recording equipment
choppers
winding machines
ovens
edge working machinery
creel
on-line cutting
communication equipment
computers
Typical problems
Typical problems may include:
process problems
equipment problems
quality problems
OHS
All operations are subject to stringent OHS requirements and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and OHS requirements, the OHS requirements take precedence
EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
It is essential that the glass finishing equipment be understood and that the importance of critical material properties, settings and readings is known. Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action.
Consistent performance should be demonstrated. In particular look to see that:
quality is monitored to minimise wastage
products are produced within specifications and customer requirements
startup and shutdown are correctly implemented
signals and alarms are responded to immediately
process measurements are continually made or observed
all OHS requirements are followed.
Competence must be demonstrated in the operation of all ancillary equipment to the level required for this unit of competency.
Context of and specific resources for assessment
Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations.
Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.
Simulation or case studies/scenarios may be required to allow for timely assessment of parts of this unit of competency. Simulation should be based on the actual plant and will include 'walk-throughs' of the relevant competency components. A bank of scenarios/case studies/what ifs and questions will be required to probe the reasoning behind observable actions.
Method of assessment
In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units.
Individual enterprises may choose to add prerequisites or co-requisite units relevant to their processes.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed.
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
It is essential that the glass finishing equipment be understood and that the importance of critical material properties, settings and readings is known. Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action.
Consistent performance should be demonstrated. In particular look to see that:
quality is monitored to minimise wastage
products are produced within specifications and customer requirements
startup and shutdown are correctly implemented
signals and alarms are responded to immediately
process measurements are continually made or observed
all OHS requirements are followed.
Competence must be demonstrated in the operation of all ancillary equipment to the level required for this unit of competency.
Context of and specific resources for assessment
Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations.
Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.
Simulation or case studies/scenarios may be required to allow for timely assessment of parts of this unit of competency. Simulation should be based on the actual plant and will include 'walk-throughs' of the relevant competency components. A bank of scenarios/case studies/what ifs and questions will be required to probe the reasoning behind observable actions.
Method of assessment
In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units.
Individual enterprises may choose to add prerequisites or co-requisite units relevant to their processes.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W2658 | PMCOPS248B | Operate glass finishing equipment | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAH48 | PMC552048 | Operate glass finishing equipment | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W748 | PMC20110 | Certificate II in Manufactured Mineral Products | Qualification |
| W750 | PMC40110 | Certificate IV in Manufactured Mineral Products | Qualification |
| W749 | PMC30110 | Certificate III in Manufactured Mineral Products | Qualification |