Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Design control measures and structures
Design control measures and structures
Unit of competency
National Code
AHCSAW504
AHCSAW504
State Code
OCT20
OCT20
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
21/05/2021
Field of Education
050999 - Environmental Studies, N.e.c.
Original Release Date
21/05/2021
Nominal Hours
50
Description
This unit of competency describes the skills and knowledge required to design erosion and sediment control measures and structures.The unit applies to individuals who work in soil and water conservation and who analyse information and exercise judgement to complete design and development activities, demonstrating a deep understanding of the technical areas within soil and water conservation. They have accountability for the work of others and analyse, design and communicate solutions to complex problems.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Identify measures or structures to be designed
- 1.1 Review erosion and sediment control plan for technical accuracy and environmental impact
- 1.2 Confirm adherence to regulations and legislation, and record on works plans
- 1.3 Confirm budget constraints for project with management or client
- 1.4 Apply design criteria according to industry standards
2. Apply design procedures
- 2.1 Calculate catchment characteristics to required accuracy
- 2.2 Determine design specifications for project
- 2.3 Use a computer aided design (CAD) program to develop draft design according to budgetary constraints and erosion and sediment control plan
- 2.4 Verify design against plans, budget and industry best practice with stakeholders
- 2.5 Review and recommend changes to the design to comply with design procedures and accepted industry practices and environmentally sustainable practices
3. Prepare specification schedule
- 3.1 Prepare documentation and specifications for design
- 3.2 Verify design and documentation complies with industry standards
- 3.3 Confirm suitability of design and specifications for the category of work and legislative requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAQ66 | AHCSAW501 | Design control measures and structures | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGF9 | AHC51120 | Diploma of Conservation and Ecosystem Management | Qualification |