Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Plan large electronic projects
Plan large electronic projects
Unit of competency
National Code
UEEEC0047
UEEEC0047
State Code
OCB76
OCB76
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
080315 - Project Management
Original Release Date
12/07/2021
Nominal Hours
54
Description
This unit involves the skills and knowledge required to plan large electronic projects.It includes developing and documenting electronics project proposals, milestones and completions. It also includes establishing budgets; applying critical path analysis; developing workflow strategies; and documenting, presenting and negotiating budgets and timelines.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Identify electronic project requirements
- 1.1 Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified and applied
- 1.2 Techniques for electronic project planning are reviewed are adopted in accordance with workplace procedures
- 1.3 Extent of the electronic project is determined from design brief specifications and/or other relevant documentation and from discussions with appropriate person/s
2 Develop electronic project plan proposal
- 2.1 Plant, material, labour and relevant costs are sought and obtained from relevant person/s in accordance with workplace policies and procedures
- 2.2 Project budget is determined from estimated plant, material, labour and other costs in accordance with workplace policies and procedures
- 2.3 Critical path analysis is applied to developing workflow strategies
- 2.4 Sources and availability of physical materials and human resources needed for the project are determined in accordance with workplace policies and procedures
- 2.5 Risk management strategies are sought and applied in the project plan
- 2.6 Project plan is reviewed in accordance with all inputs and adjusted to rectify any anomalies
- 2.7 Project plan proposal is documented in accordance with workplace policies and procedures
3 Obtain approval for project plan
- 3.1 Project plan is presented and discussed with relevant person/s
- 3.2 Alterations to project plan resulting from the presentation/discussion are negotiated with relevant person/s in accordance with constraints of workplace policies
- 3.3 Final project plan is documented and approval obtained from appropriate person/s
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WC586 | UEENEEH160A | Plan large electronic projects | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BFQ2 | UEE60220 | Advanced Diploma of Electronics and Communications Engineering | Qualification |
| BFJ6 | UEE61720 | Advanced Diploma of Engineering Technology - Electronics | Qualification |