Unit of competency Outline
Date retreived
23/07/2026 1:19 AM AWST
23/07/2026 1:19 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Lay skeleton track for cane rail system
Lay skeleton track for cane rail system
Unit of competency
National Code
FBPSUG2003
FBPSUG2003
State Code
OAL83
OAL83
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
18/04/2019
Field of Education
039907 - Rail Operations
Original Release Date
18/04/2019
Nominal Hours
18
Description
This unit of competency describes the skills and knowledge required to prepare and lay pre-fabricated rails in sugar cane haulage systems. It relates to construction of new track, and repair of existing track that has been pre-welded to meet track design and construction specifications.The unit applies to individuals who work under supervision in the sugar milling industry. All work must be carried out to comply with workplace procedures according to state/territory health and safety regulations, legislation and standards that apply to the workplace.No occupational licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan and prepare work
- 1.1 Identify the location and scope of work according to specifications
- 1.2 Confirm and prepare materials required to complete the work are available to specifications
- 1.3 Carry out pre-operational checks, confirm operational status of equipment, and report any faults
- 1.4 Select, fit and use personal protective equipment as required
- 1.5 Confirm that work is clearly signed according to safety procedures and that relevant authorities have been advised that work is in progress
- 1.6 Identify and remove potential hazards from construction area before commencing work
2. Lay and fix skeleton tracks
- 2.1 Position skeleton track section on base foundation and align to meet construction specifications
- 2.2 Fix rail lengths according to construction specifications
3. Complete work
- 3.1 Clear the construction area of debris according to workplace procedures
- 3.2 Store unused materials according to workplace procedures
- 3.3 Clean and store tools, plant and equipment according to workplace requirements
- 3.4 Record workplace information according to workplace requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WD833 | FDFSUG203A | Lay skeleton track for cane rail system | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AD871 | FBPSS00011 | Cane Railway Skill Set | Skill set |
| BEF0 | FBP31018 | Certificate III in Sugar Milling Industry Operations | Qualification |
| BEF1 | FBP20618 | Certificate II in Sugar Milling Support | Qualification |