Unit of competency Outline

Date retreived
22/07/2026 11:50 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install a cable lead-in

Install a cable lead-in

Unit of competency
National Code
ICTCBL2162A
State Code
D3317
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
15/06/2010
State Implementation and Classification
Approved Date
26/11/2013
Field of Education
031309 - Communications Equipment Installation And Maintenance
Original Release Date
26/11/2013
Nominal Hours
10
Description
This unit describes the performance outcomes, skills and knowledge required to install indoor and outdoor aerial and underground lead-ins. It involves digital reception installation, broadband and customer installations.The brief may be for a new metallic or optical cable installation or upgrade of cable capacity for an existing network or subsystem, or cabling infrastructure for convergence to Next Generation Networks (NGN).Assessment by a TITAB registered assessor is recommended.Users should confirm licensing requirements with the relevant federal, state or territory authority.
Notes
Elements and Performance Criteria
1. Prepare for cable installation
  • 1.1. Prepare for given work according to industry standards
  • 1.2. Arrange access to the site according to required procedure
  • 1.3. Inform appropriate personnel of identified hazards and constraints on worksite
  • 1.4. Obtain cable installation plan and set up installation equipment according to manufacturer's requirements
  • 1.5. Select suitable protective clothing, tools and equipment, and safety equipment, and confirm support structures are safe
2. Install aerial cable lead-in
  • 2.1. Select type of cable bearer and determine need for separate catenary wire installation
  • 2.2. Secure catenary wire or bearer wire permanently to support structure using aerial fixing devices and adjust tension to meet relevant height and minimum sag requirements to required specifications
  • 2.3. Secure cable safely to catenary wire leaving cable loop on support structure
3. Install underground cable lead-in
  • 3.1. Run push rod through pipe and attach cable for hauling
  • 3.2. Haul cable using lubricant, cable slippers or rollers to ensure no sheath damage when hauling at correct tension into and out of enclosures
  • 3.3. Provide sufficient cable allowance in enclosures for jointing and maintenance requirements
4. Seal and secure cable
  • 4.1. Seal cable ends to prevent ingress of foreign material
  • 4.2. Secure cable loop on support structure to minimise damage to conductors
  • 4.3. Weather seal building entry points where appropriate
  • 4.4. Fit over voltage protection devices to all cables with metallic component where required
5. Complete tasks on site
  • 5.1. Record any approved alteration to the original design and return to appropriate personnel
  • 5.2. Complete appropriate records and sign reports where required according to enterprise policy
  • 5.3. Restore the site to customer's satisfaction and dispose of wastes in an environmentally safe manner
  • 5.4. Notify customer and obtain sign off
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Industry standards may include:
Australian Communications Industry Forum (ACIF) standards and codes
AS Communications Cabling Manual (CCM) Volume 1
AS/NZS 3000:2007
AS/NZS 3080:2003
AS/NZS 3084:2003
AS/NZS 3085.1:2004
AS/NZS IEC 61935.1:2006
AS/NZS IEC 61935.2:2006
AS/NZS ISO/IEC 14763.3:2007
AS/NZS ISO/IEC 15018:2005
AS/NZS ISO/IEC 24702:2007
cabling security codes and regulations
ISO Draft 11801 (International)
regulated or industry codes of practice including appropriate Australian Communications and Media Authority (ACMA) technical standards
technical standards AS/ACIF S008:2006 and AS/ACIF S009:2006.
Appropriate personnel may include:
construction manager
project manager
site manager
site supervisor.
Hazards and constraints may include:
electrical supply and areas of earth potential rise (EPR) that require mandatory separation from communications cable and limitations on work
optical cable at all access points that may contain a hazardous light
risks associated with remote power feeding services.
Cable may include:
coaxial
metallic cable
optical fibre.
Protective clothing may include:
earmuffs
gloves:
leather
plastic
rubber
head protection
kneepads
masks
protective suits
safety boots
safety glasses.
Tools and equipment may be:
mechanical or hand tools, such as:
augers
cable tensioner
cherry pickers
drills
fixing brackets
hammers
height measuring device
ladders
scissor lifts
spanners.
Safety equipment may include:
aerial safety belts and lines
personal protective equipment
site hazard identification and control equipment:
flashing lights
guards
traffic signs
warning signs and tapes
witches hats.
Confirm support structures are safe refers to:
checking for condemned pole status markings
checking for visible signs of decay or stress
using industry accepted testing methods.
Aerial fixing devices may include:
clamps
hooks
pig rings
riser pipes
screw hooks.
Appropriate records may include:
building distributor (BD), campus distributor (CD), floor distributor (FD) record books and local distributor (LD) record cards
building, cabling and equipment location plans
computerised plans
databases
labelling of:
distributor pairs
distributor verticals
equipment closets
patch panels
rooms
telecommunication outlets
telecommunications administration centre (TAC) or NTD cards conform to AS/ACIF S009:2006
telecommunications cabling advice (TCA) forms:
cable drawings
cable plans
record books
record cards
TCA1 (sign off form)
TCA2.















EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the ability to:
install at least one type of aerial cable and one type of underground cable, including placing and securing cables on support structures and building faces for both internal and external locations to industry standards applying related OHS requirements and work practices
conduct and interpret test results and a minimum of three different lead-in fault remediations
haul, secure and seal cable
identify safe support structures from pole status markings, visual inspection or approved testing procedures
terminate at least one 50 pair, one 4 pair and one Ethernet lead-in cables, including accurate completion of installation records, drawing alterations and compliance forms
provide report documenting the installation and test results to client
comply with all related OHS requirements and work practices.
Context of, and specific resources for assessment
Assessment must ensure:
sites where aerial and underground cable lead-ins may be conducted
use of equipment and personal protective equipment currently used in industry
use of testing equipment currently used in industry
relevant regulatory and equipment documentation that impact on work activities.
Methods of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
review of a hands-on project completed by the candidate
review of an oral and written report with completed documentation
direct observation of the candidate terminating at least one 50 pair, one 4 pair and one Ethernet lead-in cables.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, e.g.
ICTCBL2008A Terminate metallic conductor customer cable.

Aboriginal people and other people from a non-English speaking background may have second language issues.

Access must be provided to appropriate learning and assessment support when required.

Assessment processes and techniques must be culturally appropriate, and appropriate to the oral communication skill level, and language and literacy capacity of the candidate and the work being performed.

In all cases where practical assessment is used it will be combined with targeted questioning to assess required knowledge. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency.

Where applicable, physical resources should include equipment modified for people with special needs.




Replaced By
State Code National Code Title Type
WI880 ICTCBL2163A Install a cable lead-in Unit of competency