Unit of competency Outline

Date retreived
22/07/2026 11:04 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Produce complex pad printed product

Produce complex pad printed product

Unit of competency
National Code
ICPPRN342
State Code
AUN02
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
26/03/2015
State Implementation and Classification
Approved Date
16/09/2015
Field of Education
030103 - Printing
Original Release Date
16/09/2015
Nominal Hours
50
Description
This unit describes the skills and knowledge required to produce complex pad printed product ensuring an efficient non-routine production flow that maintains product quality standards.It applies to individuals who work under supervision, and are responsibility for ensuring the production process is maintained in accordance with the requirements of the proof, and any equipment issues and production problems are identified and resolved with minimum downtime. No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Maintain non-routine pad printing process
  • 1.1 Location of objects into fixtures is monitored and adjusted if necessary
  • 1.2 Printing plates condition is monitored to ensure quality of printed product meets the approved proof standard
  • 1.3 Printing pads condition is monitored and maintained to ensure quality of printed product meets the approved proof standard
  • 1.4 Spatulas and doctor blades are monitored and adjusted to ensure quality of printed product meets the approved proof standard
OR
  • 1.5 Ink cups are monitored and adjusted to ensure quality of printed product meets the approved proof standard
  • 1.6 Printing ink viscosity is monitored and adjusted to ensure quality of printed product meets the approved proof standard
2. Maintain in-line systems
  • 2.1 In-line loading is monitored and adjusted to ensure quality of printed product meets the approved proof standard
  • 2.2 In-line pre-treatment is monitored and adjusted to ensure quality of printed product meets the approved proof standard
  • 2.3 In-line drying is monitored and adjusted to ensure quality of printed product meets the approved proof standard
  • 2.4 In-line ejection is monitored and adjusted to ensure quality of printed product meets the approved proof standard
3. Maintain non-routine production process
  • 3.1 Production process is operated in association with fellow workers and according to company specifications and planned daily schedule
  • 3.2 Production is maintained within work health and safety (WHS) requirements and company and manufacturer’s specifications
  • 3.3 Manual and/or automatic control is used as per specification
  • 3.4 Performance is monitored and verified using the process control system according to enterprise procedures
  • 3.5 Ink performance, colour, register and position of print are monitored and adjusted throughout production run
  • 3.6 Production difficulties are anticipated and preventive action is taken to prevent occurrence by timely intervention
  • 3.7 Process adjustments to eliminate problems are reported according to enterprise procedures
  • 3.8 Waste is sorted according to enterprise procedures
4. Identify and rectify faults
  • 4.1 Problems in pad printing machine operation are identified and reported according to enterprise procedures
  • 4.2 Adjustments or corrections are carried out according to specified procedures and consistent with operator’s skill level
  • 4.3 Pad printing machine operation is checked to ensure correct operation
  • 4.4 Faulty performance of equipment is identified and reported according to enterprise procedures
5. Conduct shutdown of production process
  • 5.1 Correct shutdown sequence is followed according to manufacturer’s specifications and enterprise procedures
  • 5.2 Shutdown is conducted in association with fellow workers and in compliance with WHS requirements
  • 5.3 Unused ink is correctly labelled and stored according to manufacturer/supplier specifications and enterprise procedures
  • 5.4 Solid and liquid waste is removed from operating area and recycled or disposed of, where required, according to regulatory requirements and enterprise procedures
  • 5.5 All product is removed from operating area
  • 5.6 Machine faults requiring repair are identified and reported to designated person according to enterprise procedures
  • 5.7 Repair/adjustment is verified prior to resumption of operations
6. Clean and wash up printing machine at end of print run
  • 6.1 Plates and pads are cleaned ready for next run
  • 6.2 Inking system is washed up ready for next run, and liquid waste is disposed of according to company and regulatory requirements
  • 6.3 Pre- and post-treatment units are cleaned ready for next run
  • 6.4 Production records or other documentation are accurately completed where required by enterprise procedures
No information
No information
Replaces
State Code National Code Title Type
D3178 ICPPR342C Produce complex pad printed product Unit of competency
Replaced By
State Code National Code Title Type
OBP94 ICPPRN3420 Produce complex pad printed product Unit of competency