Unit of competency Outline

Date retreived
22/07/2026 6:17 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Produce and attach millinery trims

Produce and attach millinery trims

Unit of competency
National Code
MSTML2003
State Code
BAV16
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
04/07/2016
State Implementation and Classification
Approved Date
01/12/2016
Field of Education
030107 - Garment Making
Original Release Date
01/12/2016
Nominal Hours
30
Description
This unit of competency covers the skills and knowledge required to produce and attach millinery trims.The unit of competency applies to producing and attaching decorative and functional trims for individual millinery items according to design requirements.Work is conducted according to defined procedures.Work may be conducted in small to large scale enterprises and may involve individual and team activities.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Determine job requirements
  • 1.1 Follow standard operating procedures (SOPs)
  • 1.2 Comply with work health and safety (WHS) requirements at all times
  • 1.3 Use appropriate personal protective equipment (PPE) in accordance with SOPs
  • 1.4 Identify job requirements from specifications, drawings, job sheets or work instructions
2 Prepare to construct trims for millinery items
  • 2.1 Interpret trim design and specifications for finished product
  • 2.2 Confirm material requirements
  • 2.3 Determine sequence for the production and attachment of trim
  • 2.4 Prepare materials by cutting, stiffening or shaping, according to design requirements
  • 2.5 Perform required measurements to confirm quantities and sizing of trim features
3 Construct millinery trim
  • 3.1 Follow workplace procedures
  • 3.2 Form, sew, staple or glue trims in preparation for attachment to millinery item
  • 3.3 Prepare or produce trim features
4 Finalise and check millinery trim
  • 4.1 Prepare adhesives and attachments
  • 4.2 Attach trim to millinery item, as required, to reflect design
  • 4.3 Check trimmed or finished article meets specifications, including safety of potentially dangerous items
No information
No information
Replaces
State Code National Code Title Type
W7410 LMTML2003A Produce and attach millinery trims Unit of competency