Unit of competency Outline

Date retreived
23/07/2026 11:12 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Develop and manage sustainable environmental practices

Develop and manage sustainable environmental practices

Unit of competency
National Code
MSACMT671A
State Code
W9029
TGA Status
Deleted
DTWD Status
Deleted
Current Release Number
1.00
Current Release Date
01/12/2005
State Implementation and Classification
Approved Date
06/11/2014
Field of Education
080317 - Quality Management
Original Release Date
06/11/2014
Nominal Hours
60
Description
This unit covers the knowledge and skills needed to identify opportunities for and make improvements in sustainable environmental practices in production, maintenance and logistics. Areas covered include efficient use of raw materials, management of waste, electricity conservation, heat conservation and management, water management, environment protection and environment obligations of enterprises.
Notes
Elements and Performance Criteria
1. Analyse resource use
  • 1.1. Identify all resource consuming processes
  • 1.2. Determine quantity and nature of resource consumed
  • 1.3. Analyse resource flow through different parts of the process
2. Develop resource conservation plans
  • 2.1. Determine the efficiency of use/conversion of resources
  • 2.2. Determine causes of low efficiency of use
  • 2.3. Develop plans for increasing the efficiency of resource use
  • 2.4. Check resource use plans comply with regulations/licensing requirements
  • 2.5. Determine benefit/cost of plans
3. Investigate alternative sources of resource
  • 3.1. Determine the function of the resource used
  • 3.2. Develop a specification for function
  • 3.3. Identify a range of sources for meeting that function
  • 3.4. Determine benefit/cost for alternative resource sources
4. Develop plans for more efficient resource use
  • 4.1. Compare benefit/costs for different alternatives developed
  • 4.2. Rank proposals based on benefit/cost compare to limited resources
  • 4.3. Check proposals meet regulatory requirements
  • 4.4. Recommend proposals for improving resource efficiency
5. Implement selected plans
  • 5.1. Liaise with relevant people to implement resource efficiency plans
  • 5.2. Follow through to ensure implementation occurs
  • 5.3. Monitor implementation and make adjustments as required
  • 5.4. Check new resource usage to ensure improvements have occurred
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Resources
Resources includes all raw materials and components as well as cooling water, process water, cleaning water, fuels, lubricants and other materials used in/required by the process.
Waste
Waste (also known as muda in the Toyota Production System and its derivatives) is any activity which does not contribute to customer benefit/features in the product.
Within manufacturing, categories of waste include:
excess production and early production
delays
movement and transport
poor process design
inventory
inefficient performance of a process
making defective items.
Waste for this unit may include activities which do not yield any benefit to the organisation or any benefit to the organisations customers.
Necessary waste
Necessary waste is any activity or cost which does not contribute directly to customer benefit/feature in the product, and which cannot be avoided (e.g. regulatory compliance and fixed costs). Necessary waste cannot be eliminated but should be managed.
Unnecessary waste
Unnecessary waste is any activity or cost which does not contribute directly to customer benefit/features in the product and can be avoided. Unnecessary waste should be eliminated as quickly as practical.
EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the assessment guidelines for this training package.

Overview of assessment requirements
The person will be able to analyse the resource use of any/all part/s of the process and determine if there are more efficient/cheaper ways of achieving the same result.

What are the specific resource requirements for this unit?

Access to an organisation seeking to improve its resource usage.
In what context should assessment occur?

Assessment needs to be conducted in an organisation where resource use is a significant cost component.
Are there any other units which could or should be assessed with this unit or which relate directly to this unit?

This unit is related to:
MSACMT271A Use sustainable environmental practices - which covers the individual application level, and
MSACMT670A Develop and manage sustainable energy practices - which covers energy specific aspects.
What method of assessment should apply?

Assessors must be satisfied that the person can consistently perform the unit as a whole, as defined by the Elements, Performance Criteria, skills and knowledge. A holistic approach should be taken to the assessment.
Assessors should gather sufficient, fair, valid, reliable, authentic and current evidence from a range of sources. Sources of evidence may include direct observation, reports from supervisors, peers and colleagues, project work, samples, organisation records and questioning. Assessment should not require language, literacy or numeracy skills beyond those required for the unit.
The assessee will have access to all techniques, procedures, information, resources and aids which would normally be available in the workplace.
The method of assessment should be discussed and agreed with the assessee prior to the commencement of the assessment.
What evidence is required for demonstration of consistent performance?

If evidence is from a major project to improve resource efficiency, then it may provide sufficient evidence. If evidence is from a number of minor improvements to resource use then a range of such improvements will be needed to provide sufficient evidence.
Replaces
State Code National Code Title Type
W2603 MCMT671A Develop and manage sustainable environmental practices Unit of competency
Replaced By
State Code National Code Title Type
D7731 MSS015002A Develop strategies for more sustainable use of resources Unit of competency