Unit of competency Outline

Date retreived
22/07/2026 11:50 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Optimise CNC operations

Optimise CNC operations

Unit of competency
National Code
FWPTMM5205
State Code
AXJ53
TGA Status
Deleted
DTWD Status
Deleted
Current Release Number
2.00
Current Release Date
18/12/2018
State Implementation and Classification
Approved Date
05/10/2016
Field of Education
080905 - Practical Computing Skills
Original Release Date
05/10/2016
Nominal Hours
180
Description
This unit of competency describes the skills and knowledge required to optimise the overall performance of computer numerical control (CNC) sizing machines and CNC machining and processing centres, to maximise production output in a timber manufacturing facility. The unit applies to individuals who work as managers or supervisors in timber manufacturing facilities. They generally demonstrate autonomy, judgement and limited responsibility in known or changing contexts and within established parameters.No licensing, legislative, regulatory or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Establish optimal operating conditions
  • 1.1 Review workplace health and safety requirements and emergency procedures, identify and report hazards and use personal protective equipment according to workplace requirements throughout the optimisation process
  • 1.2 Assess production potential of system components
  • 1.3 Analyse production orders and plans to identify sustained production requirements
  • 1.4 Identify and analyse integration options to establish optimal integration model
  • 1.5 Assess and record software and programming requirements to attain and maintain optimal integration
2. Prepare for software installation
  • 2.1 Diagnose program format and operational purpose and identify specified applications
  • 2.2 Check specifications for intended operating conditions
  • 2.3 Check program instructions for compliance with specifications
  • 2.4 Counter set software timers to specification
3. Install and integrate automatic process machine control programs
  • 3.1 Select appropriate program loading technique
  • 3.2 Connect external loading devices correctly to automatic process machine control system
  • 3.3 Place machine control system in a correct operational mode to accept program loading
  • 3.4 Download program according to manufacturer recommended procedure
  • 3.5 Check during and after downloading to ensure accurate and complete data transfer
  • 3.6 Disconnect external program loading devices and connections from process and machine control system
  • 3.7 Complete integration protocols and actions
4. Commission automatic process and machine control program
  • 4.1 Monitor operation of equipment using the program for accuracy and safe performance
  • 4.2 Measure and check outputs for compliance with specifications and ensure maximum output
  • 4.3 Check external inputs for compliance with specifications
  • 4.4 Check total operation for compliance with specifications and resolve any issues
  • 4.5 Identify location for storage of program master copy and store accordingly
  • 4.6 Record installation and commissioning process and problems and report to appropriate personnel