Unit of competency Outline

Date retreived
22/07/2026 9:31 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Conduct pre-movement checks on rolling stock

Conduct pre-movement checks on rolling stock

Unit of competency
National Code
TLIB3129
State Code
AVK30
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
22/11/2021
State Implementation and Classification
Approved Date
23/02/2016
Field of Education
039907 - Rail Operations
Original Release Date
23/02/2016
Nominal Hours
20
Description
This unit involves the skills and knowledge required to conduct pre-movement checks on rolling stock in accordance with relevant workplace practices, regulations and codes of practice.It includes conducting pre-movement checks, moving and stabling the rolling stock in accordance with organisational requirements.This unit applies to people required to carry out these activities as part of a maintenance role within a defined location.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Carry out pre-movement checks
  • 1.1 Allocation of rolling stock is checked in conjunction with appropriate personnel
  • 1.2 Rolling stock to be inspected and prepared is located
  • 1.3 Hazards are identified, risks are assessed and control measures are implemented
  • 1.4 Completion of all maintenance activities is confirmed
  • 1.5 Checks for safety controls are conducted in accordance with workplace procedures
  • 1.6 Internal and external integrity checks are conducted in accordance with workplace procedures
  • 1.7 Fluid levels are checked and appropriate actions taken, as required
2 Move rolling stock
  • 2.1 Rolling stock is shunted in accordance with manufacturer instructions and/or organisational procedures, and faults are recognised, diagnosed, reported and recorded in appropriate records for follow-up
  • 2.2 For critical or serious equipment faults that cannot be readily rectified, rolling stock shunt is halted, faulty equipment is isolated and tagged, and problem is reported for rectification
  • 2.3 Functionality of equipment is interpreted to confirm effective air and electrical operation, and where a problem is indicated, actions are taken to determine the cause and to rectify or report the situation
  • 2.4 Fluid levels are rechecked after starting and appropriate actions taken, as required
3 Stable rolling stock
  • 3.1 Correct clearances for stabling location are confirmed
  • 3.2 Rolling stock is secured in accordance with workplace procedures
  • 3.3 Personal or equipment lockouts are applied in accordance with workplace procedures, as required
  • 3.4 Appropriate documentation is confirmed, completed and processed in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
WG196 TLIB3129A Conduct pre-movement checks on rolling stock Unit of competency