Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Construct decorative brickwork

Construct decorative brickwork

Unit of competency
National Code
CPCCBL3015A
State Code
W9334
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
02/04/2014
Field of Education
040309 - Bricklaying And Stonemasonry
Original Release Date
02/04/2014
Nominal Hours
40
Description
This unit of competency specifies the outcomes required to construct decorative brickwork to buildings. It includes planning, set out and laying of bricks to form a decorative finish.
Notes
Elements and Performance Criteria
1. Prepare for work.
  • 1.1. Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information to determine the required bricklaying and blocklaying tasks.
  • 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
  • 1.3. Signage and barricade requirements are identified and implemented.
  • 1.4. Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement.
  • 1.5. Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
  • 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
  • 1.7. Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied.
2. Set out for decorative brickwork.
  • 2.1. Location and structural feature details of decorative brickwork are determined from drawings and specifications.
  • 2.2. Brickwork is set out according to location and dimensions from drawings and specifications.
  • 2.3. Mortar is mixed to specifications.
3. Lay bricks to form corbels and protrusions.
  • 3.1. Corbelling design is checked from specifications to ensure overhang design is in accordance with job drawings and specifications.
  • 3.2. Bricks are laid to maintain bond and level alignment to form corbels to design and specifications.
  • 3.3. Bricks are laid to form featured protrusions in accordance with job drawings and specifications.
4. Construct brickwork to acute and obtuse angled corners.
  • 4.1. Junction at corners is determined in accordance with specifications.
  • 4.2. Standard bricks are laid to line and level to form dogtooth and mitre junctions in accordance with specifications.
  • 4.3. Squints and standard bricks are laid to line and level to form designed flush junctions in accordance with specifications.
  • 4.4. Bond and gauge are maintained to specification.
5. Lay plinth bricks or squints to form plinth areas or sills.
  • 5.1. Plinth bricks are laid to level and alignment to form protruding plinth in accordance with specifications.
  • 5.2. Plinth bricks or squints are laid to sill locations to form feature finish to level and alignment in accordance with specifications.
6. Install decorative capping.
  • 6.1. Bricks are cut and laid on edge mitre coping to 90° corner.
  • 6.2. Bricks are cut and laid on edge mitre coping to 135° corner.
7. Construct decorative panel.
  • 7.1. Area for set out is located, and is checked for plumb, level and to be clean and dry in accordance with manufacturer specifications.
  • 7.2. Panel is set out to plan and specifications.
  • 7.3. Whole bricks are laid to conform to the set out.
  • 7.4. Starting edges and feather edges are cut and laid to conform to set out.
8. Finish joints.
  • 8.1. Brickwork joints in laid brickwork are raked or ruled to correct depth in accordance with job specification.
  • 8.2. Brickwork is brushed down prior to drying using appropriate brushing tool in accordance with job specifications.
9. Clean up.
  • 9.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
  • 9.2. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions where specified
memos
MSDS
organisation work specifications and requirements
plans and specifications
regulatory and legislative requirements pertaining to constructing decorative brickwork
relevant Australian standards
safe work procedures related to constructing decorative brickwork
signage
verbal or written and graphical instructions
work bulletins
work schedules.
Bricklaying and blocklaying tasks:
include all clay brick (wire cut/pressed) and concrete block (hollow and solid) masonry work
may be performed on a new construction site, an existing structure being renovated or extended or an existing structure subject to service restoration or maintenance.
Safety (OHS) is to be in accordance with legislation, regulations, codes of practice, organisational safety policies and procedures, and project safety plan and may include:
emergency procedures, including emergency shutdown and stopping, extinguishing fires, organisational first aid requirements and evacuation
handling of materials
hazard control
hazardous materials and substances
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
underground services, including water, gas, electricity and communications
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
working with dangerous materials
organisational first aid
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
use of firefighting equipment
use of tools and equipment
workplace environment and safety.
Tools and equipment:
include:
bolsters
brick grabs
brooms
builders' lines
concrete mixers
elevators
hammers (brickies, club and scutch)
hoses
jig saws
jointing tools
line blocks
line pins
masonry saws
measuring tapes and rules
mortar boards
margin or raking tools
profiles
shovels
spirit levels
straight edges
trowels
wheelbarrows
may include:
brick buggies
forklifts
materials hoists
pallet trolleys
scaffolds.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications, where specified
workplace operations and procedures.
Materials include:
aggregates
cement
clay bricks
lime
masonry blocks
reinforcing materials
sealants
timber and plyboard
waterproofing materials.
Environmental requirements include:
clean-up protection
noise and dust
vibration
waste management.
Statutory and regulatory authorities include:
federal, state and local authorities administering applicable Acts, regulations and codes of practice.
Decorative brickwork includes:
angles
corbelling
irregular corner junctions (special bricks, plinth and sill finishes)
panelling
protrusions.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools, plant and equipment
communicate and work effectively and safely with others
as a minimum, construct a wall of 3 course corbel to decorative features; construct a 90° and a 135° corner using squints, dog toothing and mitre to a minimum of 600mm high; cut and lay brick on edge coping to 90° and 135° corner; using standard bricks, squints and plinths, lay return corner sills to 90° and 135° corners and construct a herring bone panel of 900 x 1200mm, ensuring:
correct identification of requirement and finishing of the tasks
correct selection and use of appropriate processes, tools and equipment
completing all work to specification.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
W1780 BCGBL3015B Construct decorative brickwork Unit of competency
Replaced By
State Code National Code Title Type
OCO57 CPCCBL3015 Construct decorative brickwork Unit of competency