Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install primary ground support

Install primary ground support

Unit of competency
National Code
RIICFW303D
State Code
WH094
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
07/12/2014
State Implementation and Classification
Approved Date
29/05/2014
Field of Education
040301 - Building Science And Technology
Original Release Date
29/05/2014
Nominal Hours
20
Description
This unit describes a participant’s skills and knowledge required to install primary ground support in Civil Construction.This unit is appropriate for those working in operational roles. No licensing or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan and prepare
  • 1.1 Access, interpret and apply documentation to install primary ground support and ensure the work activity is compliant
  • 1.2 Obtain, interpret and clarify and confirm work instructions before proceeding
  • 1.3 Confirm and apply environmental protection and safety requirements
  • 1.4 Obtain, interpret and implement traffic management signage requirements
  • 1.5 Select, and check for faults, plant, tools and equipment to carry out tasks
  • 1.6 Select and wear correct personal protective equipment appropriate for work activities
  • 1.7 Identify, address and report environmental issues, potential hazards and risks
  • 1.8 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
2. Set out and prepare for primary ground support
  • 2.1 Determine the requirements for ground support construction
  • 2.2 Identify and implement method of ground support installation
  • 2.3 Obtain material required for primary ground support
  • 2.4 Install primary ground support in accordance with the progressive development of the excavation process
  • 2.5 Set out position of sets/rings and points of support
  • 2.6 Prepare component parts of ground support
3. Install primary ground support
  • 3.1 Select relevant primary ground support system
  • 3.2 Install primary ground support system
4. Maintain primary ground support
  • 4.1 Carry out daily inspection of primary ground support to ensure system is secure
  • 4.2 Identify faults and make adjustments to ensure ground support is maintained
  • 4.3 Identify ground faults and determine and carry out support rectifications
5. Clean up
  • 5.1 Clear work area and dispose of or recycle materials
  • 5.2 Clean, check, maintain and store plant, tools and equipment
No information
No information
Replaces
State Code National Code Title Type
WB261 RIICFW303A Install primary ground support Unit of competency
Replaced By
State Code National Code Title Type
OCX08 RIICFW303E Install primary ground supports Unit of competency