Unit of competency Outline
Date retreived
23/07/2026 1:13 AM AWST
23/07/2026 1:13 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install and maintain computer-based interlocking rail systems
Install and maintain computer-based interlocking rail systems
Unit of competency
National Code
UEERS0006
UEERS0006
State Code
OBX86
OBX86
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031317 - Electronic Equipment Servicing
Original Release Date
12/07/2021
Nominal Hours
27
Description
This unit involves the skills and knowledge required to install/maintain computer-based electronic equipment for rail network signalling system.It includes preparing and installing/maintaining computer-based interlocking (CBI) equipment. It also includes completing installation/maintenance of CBI systems and replacing faulty equipment requirements.Persons achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and comply with relevant codes of practice, rules and/or guidelines.No other licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to install/maintain CBI rail equipment
- 1.1 Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and clarified
- 1.2 Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures are implemented in preparation for work
- 1.3 Scope of installation/maintenance work is determined from job specifications, drawings and regulatory requirements
- 1.4 Materials needed for the installation/maintenance work are obtained in accordance with workplace procedures and checked against job specifications
- 1.5 Tools, equipment and testing devices needed for installation/maintenance work are obtained in accordance with workplace procedures and checked for correct operation and safety
2 Install/maintain CBI rail system
- 2.1 WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
- 2.2 Reports or fault logs are identified by accessing diagnostic terminal
- 2.3 Fault correction activities are prioritised by reviewing the fault reports and previous corrective actions
- 2.4 Records of previously corrective actioned faults are deleted/cleared from the terminal
- 2.5 Source of the fault is identified by assessing the diagnostics terminal
- 2.6 Corrective action required is determined and implemented
- 2.7 Appropriate mechanisms for the safe and efficient rectification of the fault are determined
- 2.8 Methods for dealing with unplanned situations are determined on the basis of safety and specified work outcomes
- 2.9 Rail system monitoring is conducted efficiently, without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices
- 2.10 Replacement equipment is obtained from spare stock to comply with identified fault repair requirements
- 2.11 Faulty component/equipment is identified and removed in accordance with organisation practices and procedures
- 2.12 Replacement component/equipment is installed and connected to power in accordance with manufacturer specifications
- 2.13 Correct test procedures are identified and implemented to confirm all operations are within specifications
- 2.14 Equipment operations are monitored to ensure system integrity
- 2.15 Signal and voltage levels are monitored, checked and adjusted, as required, in accordance with operational requirements
- 2.16 Completed statistical records and equipment/operational management information are accurately recorded and maintained to support ongoing monitoring of systems and equipment performance
3 Complete CBI rail system installation/maintenance
- 3.1 WHS/OHS risk control work completion measures and workplace procedures are followed
- 3.2 Non-conforming equipment is identified and tagged for repair type and extent of fault is identified and recorded, as required
- 3.3 Faulty equipment requiring repair is segregated and appropriate records are completed in preparation for despatching to repairer
- 3.4 Spare equipment stocks are reviewed to ensure adequate availability
- 3.5 Priority for repair and/or replacement of equipment is determined by evaluation of stock levels and fault logs
- 3.6 Work completion is documented and appropriate person/s notified of repair and replacement priorities in accordance with workplace procedures and relevant reports produced
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WC735 | UEENEEN114A | Install and maintain computer based interlocking rail systems | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OFD96 | UEERS0027 | Maintain computer-based interlocking rail systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BFO2 | UEE41220 | Certificate IV in Electrical - Rail Signalling | Qualification |