Unit of competency Outline
Date retreived
21/07/2026 11:21 PM AWST
21/07/2026 11:21 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Conduct evaluation of network protection and control system faults
Conduct evaluation of network protection and control system faults
Unit of competency
National Code
UETDRTS035
UETDRTS035
State Code
OED48
OED48
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
17/02/2023
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
17/02/2023
Nominal Hours
55
Description
This unit includes the skills and knowledge required to conduct evaluation of network protection and control system faults in the electricity supply industry (ESI).It includes interpretation of targets, flags and indicators, the interpretation of fault reports using downloaded event data, and development of conclusions and recommendations.It also includes measurements, interpretation and analysis of protection and control schemes, the detailed operation and setting of protection and control schemes, and location and rectification of faults. The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may also apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Prepare to conduct evaluation of network protection and control system faults
- 1.1 Workplace organisational requirements for the evaluation of network protection and control system faults are reviewed and determined
- 1.2 Purpose of the evaluation of network protection and control system faults is established
- 1.3 Testing procedures are discussed and reviewed with appropriate personnel
- 1.4 Testing parameters are established from workplace organisational requirements
- 1.5 Tools, equipment and personal protective equipment (PPE) required for work are determined, obtained and confirmed in working order
- 1.6 Work is prioritised and sequenced for completion in accordance with workplace requirements
- 1.7 Relevant stakeholders are identified and liaised with
- 1.8 Hazards are identified, risks assessed, and control measures identified
- 1.9 Work permits are organised in accordance with workplace requirements
2 Conduct evaluation of network protection and control system faults
- 2.1 Relevant stakeholder liaison and work permits are applied
- 2.2 Manual handling and use of tools, equipment and PPE are carried out in accordance with workplace requirements
- 2.3 Hazard control measures are applied and monitored in accordance with workplace requirements
- 2.4 Network protection and control system faults are evaluated in accordance with workplace requirements
- 2.5 Network protection and control system faults are tested in accordance with workplace requirements
- 2.6 Solutions to non-routine problems are identified and actioned
- 2.7 Quality checks of work are undertaken in accordance with workplace requirements
3 Complete work and documentation
- 3.1 Completed work is checked for compliance against workplace requirements
- 3.2 Relevant stakeholders are notified of completion and reports and/or completion documents are finalised
- 3.3 Faults and evaluation findings are documented in accordance with workplace requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| ODN82 | UETDRTS006 | Conduct evaluation of power system substation faults | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BHY4 | UET60222 | Advanced Diploma of ESI - Power Systems | Qualification |