Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install dry wall passive fire-rated systems

Install dry wall passive fire-rated systems

Unit of competency
National Code
CPCCWC3003A
State Code
W9606
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
02/04/2014
Field of Education
040313 - Ceiling, Wall And Floor Fixing
Original Release Date
02/04/2014
Nominal Hours
80
Description
This unit of competency specifies the outcomes required to select and install dry wall fire-rated systems to walls and ceilings.It includes planning and preparation for installation; installation of approved systems for timber stud walls, steel stud partitions, shaft walls, timber joist and suspended ceilings; and completion of post-installation activities.
Notes
Elements and Performance Criteria
1. Plan and prepare.
  • 1.1. Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
  • 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
  • 1.3. Signage and barricade requirements are identified and implemented.
  • 1.4. Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
  • 1.5. Material quantity requirements are calculated in accordance with plans and specifications and quality requirements.
  • 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
  • 1.7. Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.
2. Line a timber stud wall using a fire-rated system.
  • 2.1. Structure of the timber wall for load or non-load bearing is established.
  • 2.2. Fire-rating design is selected for the timber stud wall.
  • 2.3. Materials are set out to manufacturers' fire-rated test.
  • 2.4. Fixings are spaced in accordance with manufacturer specifications.
  • 2.5. Material is fixed using correct procedures and fixing.
  • 2.6. Penetrations are completed safely and in accordance with manufacturers' design and job specifications.
  • 2.7. Joints are finished to exposed face layers of sheeting using recommended materials and procedures.
3. Construct steel stud fire-rated partition system.
  • 3.1. Fire-rating design is selected for the steel stud wall.
  • 3.2. Correct fixing requirements are established for the steel stud wall as designated by the manufacturer and in accordance with relevant fire test criteria.
  • 3.3. Deflection heads are secured and sealant is applied in accordance with the fire-rated system design.
  • 3.4. Material is set out in accordance with manufacturers' fire-rated test.
  • 3.5. Fixings are spaced in accordance with manufacturer specifications.
  • 3.6. Material is fixed using correct procedures and fixings.
  • 3.7. Penetrations are completed safely and in accordance with manufacturers' design and job specifications.
  • 3.8. Joints are finished to exposed face sheet layers using recommended materials and procedures.
4. Construct a fire-rated shaft wall system.
  • 4.1. Material is selected in accordance with manufacturer specifications.
  • 4.2. Components are fixed to exact clearances to manufacturer specifications.
  • 4.3. Materials are set out in accordance with manufacturers' design and job specifications.
  • 4.4. Penetrations are completed safely and in accordance with specifications.
  • 4.5. Joints are finished to exposed face sheet layers using recommended materials and procedures.
5. Line a timber joist ceiling using fire-rated system.
  • 5.1. Ceiling joist substrate is prepared to be flat and straight to accommodate lining of the required fire-rated system.
  • 5.2. Fixings are selected in accordance with manufacturers' design.
  • 5.3. Lining is applied in accordance with manufacturers' design.
  • 5.4. Fixings are spaced at correct intervals.
  • 5.5. Penetrations are completed safely and in accordance with job specifications.
6. Construct a suspended ceiling with a fire-rating system.
  • 6.1. Materials are selected for required fire-rated ceiling according to manufacturer specifications.
  • 6.2. Fixings are chosen in accordance with manufacturers' design.
  • 6.3. Ceiling is constructed to be flat, true, level and structurally sound.
  • 6.4. Joints are finished to exposed face sheet layers using recommended materials and procedures.
  • 6.5. Penetrations are completed safely and in accordance with specifications.
7. Clean up.
  • 7.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
  • 7.2. Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to the installation of dry wall passive fire-rated systems
relevant Australian standards
safe work procedures relating to the installation of dry wall passive fire-rated systems
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
hazard control
hazardous materials and substances
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
cutting tools
lighting
manual handling
noise, dust and ventilation
power equipment
power sources and cables
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment:
include:
broad knives
caulking guns
hammers
measuring tapes and rules
power drills
power leads
screwguns
squares
tin snips
trowels
may include:
C clamps
locking saws and drop saws
masonry drills
saw stools
setting boxes.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Materials for fire-rated systems include:
base compound coats
finishing coats
fire grade metal studs and track
fire grade plasterboard sheeting
fire sealants
perforated paper tapes
vermiculite or equivalent product.
Environmental requirements include:
clean-up management
dust and noise
vibration
waste management.
Dry wall passive fire-rated systems are to comply with relevant Australian standards and codes and:
include:
columns and beams
steel stud two-hour system
may include:
shaft walls
suspended ceilings
timber joist ceilings
timber stud walls.
Fixings and fasteners for installation of fire-rated systems include:
30 mm S type screws
30 mm and 40 mm L type screws
30 mm and 45 mm W type screws
30 mm, 40 mm, 50 mm, 60 mm plasterboard nails
metal masonry anchors
wafer head screws.
Penetrations include those related to:
authorised piping
communications
control joints
electrical power.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures including quality requirements
safely and effectively operate and use tools, plant and equipment
communicate and work effectively and safely with others
install to specification a minimum of three dry wall passive fire-rated systems with:
one for a steel stud wall
one covering columns and beams
one comprising a multiple layer system.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
workplace location or simulated workplace
materials relevant to the installation of dry wall passive fire-rated systems
hand and power tools and equipment appropriate to the installation of dry wall passive fire-rated systems
realistic activities covering the mandatory task requirements
specifications and work instructions.
Assessment of this unit of competency may be in conjunction with assessment of other units commonly performed at the same time in normal job roles.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
W1916 BCGWC3005B Install dry wall passive fire-rated systems Unit of competency
Replaced By
State Code National Code Title Type
OCP18 CPCCWC3003 Install dry wall passive fire-rated systems Unit of competency