Unit of competency Outline
Date retreived
21/07/2026 11:20 PM AWST
21/07/2026 11:20 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Rework paint faults
Rework paint faults
Unit of competency
National Code
AUMGTP3002
AUMGTP3002
State Code
WE166
WE166
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
07/08/2012
Field of Education
030507 - Automotive Vehicle Refinishing
Original Release Date
07/08/2012
Nominal Hours
12
Description
This unit describes the application of the required skills and knowledge to identify and rework paint faults.No licensing, legislative, regulatory or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Identify paint film faults
- 1.1. Paint film faults are identified to ensure the correct repair methods are applied in the rework processes
- 1.2. The cause/s of the paint film faults are identified in order to ensure fault is rectified and / or removed during the rework process
2. Select, use and maintain appropriate tools and equipment
- 2.1. Tools, equipment and materials are selected and inspected to meet job requirements
- 2.2. Tools and equipment that are faulty are reported, tagged and stored in designated areas for repair
- 2.3. Tools and equipment are cleaned at the end of each paint rework to prevent blemishes to surfaces on the next paint rework
- 2.4. Tools, equipment and materials are used in accordance with organisation and OHS requirements
3. Prepare faulty paint surfaces for rectification
- 3.1. Masking papers and tapes are applied to the surrounding panels to protect painted surfaces from damage and overspray
- 3.2. Faulty paint surfaces are scuffed back to the required pre-paint standard
- 3.3. Scuffed panels are wiped and cleaned to the required pre-paint standard
- 3.4. Scuffed panels are inspected to ensure the paint fault has been totally removed
4. Apply putties, primer surfaces and colour coatings
- 4.1. Putties and primer surfaces are prepared to the consistency recommended in the suppliers instructions guide
- 4.2. Putties and primer surfaces are applied to the specifications stated in the standard operating procedures
- 4.3. Colour coatings are matched in accordance with the paint number shown on the vehicle identification plate
- 4.4. Colour coatings are mixed to the viscosity recommended in the supplier instruction guide
- 4.5. Colour coatings are applied and blended into the existing paint work
5. Finish repainted area and complete paperwork
- 5.1. Painted surfaces are baked to the required hardness
- 5.2. Repainted surfaces are polished to the required lustre
- 5.3. Surrounding areas are cleaned to ensure they show no excess materials or overspray
- 5.4. Rework job sheets are completed and attached to the vehicle
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Materials may include:
putties, primer surfaces, colour coatings, phosphate dips, primer coatings, colour coatings, anti-chip materials, etch primers, lacquers, enamels, two pack and anti chip paints, sealers, solvents, masking tapes and papers, and abrasive papers, spirit wipes, de-mineralised water.
Organisationrequirements may include:
access and equity principles and practices
environmental management (waste disposal, recycling and re-use guidelines)
emergency and evacuation procedures
equipment use procedures
ethical standards
legal obligations
maintenance and storage procedures
OHS requirements
organisational and site guidelines
policies and procedures relating to own role and responsibility
procedural manuals
quality assurance guidelines
quality and continuous improvement processes and standards
recording and reporting guidelines.
OHS requirements may include:
Legislation and regulations, organisational safety policies and procedures and may include: the use of personal protective equipment and clothing, rescue services, fire fighting organisation and equipment, first aid equipment, hazard and risk control and elimination, systems covering the use of hazardous materials and substances and manual handling procedures including lifting and carrying.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.
Materials may include:
putties, primer surfaces, colour coatings, phosphate dips, primer coatings, colour coatings, anti-chip materials, etch primers, lacquers, enamels, two pack and anti chip paints, sealers, solvents, masking tapes and papers, and abrasive papers, spirit wipes, de-mineralised water.
Organisationrequirements may include:
access and equity principles and practices
environmental management (waste disposal, recycling and re-use guidelines)
emergency and evacuation procedures
equipment use procedures
ethical standards
legal obligations
maintenance and storage procedures
OHS requirements
organisational and site guidelines
policies and procedures relating to own role and responsibility
procedural manuals
quality assurance guidelines
quality and continuous improvement processes and standards
recording and reporting guidelines.
OHS requirements may include:
Legislation and regulations, organisational safety policies and procedures and may include: the use of personal protective equipment and clothing, rescue services, fire fighting organisation and equipment, first aid equipment, hazard and risk control and elimination, systems covering the use of hazardous materials and substances and manual handling procedures including lifting and carrying.
EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for this Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the following is essential:
compliance with relevant legislative, regulations, standards, codes of practice and establish safe practices and enterprise policies and procedures for managing personal work priorities
maintaining a working knowledge of current work systems and practices
working and communicating effectively and positively with others involved in the work
applying, within authority, the requirements of the job or work role in relation to:
achieving production goals
achieving work quality goals
responding positively to changing work requirements
contributing effectively to cost reduction initiatives
effectively applying problem solving techniques
modify activities to cater for variations in workplace context and environment
employ appropriate reworking techniques for identified faults
prepare and use solvents to eliminate rust, remove greases, and remove protective waxes
interpret and communicate operational information
select appropriate sealants, adhesives, paints, tools and equipment
employ mechanical and manual sanding techniques
mix, prepare and apply paints, primers, lacquers, enamels, and two pack paints
employ safe working practices
maintain company records - paper based / electronic.
Context of and specific resources for assessment
assessment of the competency should take place in a safe working environment in a passenger motor vehicle manufacturing plant or simulated environment using tools/equipment/machinery required for the production process without undue disruption to the production process
assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints.
Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge
assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure its correct interpretation and application
assessment may be applied under project related conditions (real or simulated) and require evidence of process
assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances.
The Evidence Guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for this Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the following is essential:
compliance with relevant legislative, regulations, standards, codes of practice and establish safe practices and enterprise policies and procedures for managing personal work priorities
maintaining a working knowledge of current work systems and practices
working and communicating effectively and positively with others involved in the work
applying, within authority, the requirements of the job or work role in relation to:
achieving production goals
achieving work quality goals
responding positively to changing work requirements
contributing effectively to cost reduction initiatives
effectively applying problem solving techniques
modify activities to cater for variations in workplace context and environment
employ appropriate reworking techniques for identified faults
prepare and use solvents to eliminate rust, remove greases, and remove protective waxes
interpret and communicate operational information
select appropriate sealants, adhesives, paints, tools and equipment
employ mechanical and manual sanding techniques
mix, prepare and apply paints, primers, lacquers, enamels, and two pack paints
employ safe working practices
maintain company records - paper based / electronic.
Context of and specific resources for assessment
assessment of the competency should take place in a safe working environment in a passenger motor vehicle manufacturing plant or simulated environment using tools/equipment/machinery required for the production process without undue disruption to the production process
assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints.
Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge
assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure its correct interpretation and application
assessment may be applied under project related conditions (real or simulated) and require evidence of process
assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH966 | AUMGTP002 | Rework vehicle paint faults | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J177 | AUM30212 | Certificate III in Automotive Manufacturing Technical Operations - Bus, Truck and Trailer | Qualification |