Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Monitor and operate gated spillways

Monitor and operate gated spillways

Unit of competency
National Code
NWP318A
State Code
D1900
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
30/04/2012
State Implementation and Classification
Approved Date
14/01/2009
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
14/01/2009
Nominal Hours
50
Description
This unit of competency describes the outcomes required to manage and conduct surveillance of catchment run-off through dams and other water storage assets with gated spillways for dam/storage operations and flood routing.
Notes
Elements and Performance Criteria
1Monitor flow and flood routing.
  • 1.1 Monitor catchment behaviour during normal and flood conditions according to organisational procedures and practices.
  • 1.2 Determine outflow using standard flow rate calculations.
  • 1.3 Determine flow control settings.
2Plan and prepare for dam or storage operation.
  • 2.1 Correctly apply guidelines and regulatory requirements for dam or water storage operation to operation plans.
  • 2.2 Apply relevant organisational policies, standard operating procedures and incident management plans to dam/water storage operation plans and preparations.
  • 2.3 Conduct inspections according to organisational and statutory requirements.
3Implement dam / water storage operation plans.
  • 3.1 Apply operation plans according to organisational and statutory requirements.
  • 3.2 Inspect and test plant and equipment according to manufacturer's guidelines and organisational requirements.
  • 3.3 Test, assess and document safety mechanisms.
4Regulate flows.
  • 4.1 Regulate flow control mechanisms to maintain safety of asset and required system supply and flood routing.
  • 4.2 Produce data relating to system operation and performance according to organisational requirements.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs if the candidate, accessibility of the item, and local industry and regional contexts.
Guidelines and regulatory requirements for dam or water storage operation include:
International Commission on Large Dams
Australian National Committee on Large Dams (ANCOLD) guidelines
storages may include:
weirs
reservoirs
Organisational and statutory requirements may include:
Occupational Health and Safety, including the use of personal protective equipment
environmental laws and policies
by-laws and organisational policies
Water Acts
construction and occupational health and safety regulations
public safety and disaster plans
International Commission on Large Dams
Australian National Committee on Large Dams guidelines
state government or state committees
asset management plan
Plant and equipment may include:
gantry crane operations
two-way radio
Flow control mechanisms may include:
sand dams
temporary dam structures
diversion of flows
temporary and permanent bulkhead gates
Data may include:
operation and maintenance manuals
past inspection reports
operation, monitoring and testing records
observation and associated comments and reports
original design plans
design modifications
construction records and reports
survey information
maintenance records
performance data
The evidence guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate the ability to manage and conduct surveillance of catchment run-off through dams and other water storage assets including:
operating gated spillway in conformance with standard operating procedures
interpreting technical documentation
identifying and investigating operational problems
collecting and analysing technical information
preparing required reports
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
relevant codes, standards, and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
Questioning will be undertaken in a manner appropriate to the skill levels of the operator, any cultural issues that may affect responses to the questions, and reflecting the requirements of the competency and the work being performed.