Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Demould concrete products
Demould concrete products
Unit of competency
National Code
PMC552058B
PMC552058B
State Code
WA944
WA944
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
19/11/2010
Field of Education
030305 - Materials Engineering
Original Release Date
19/11/2010
Nominal Hours
20
Description
This unit of competency covers the dismantling, reassembling, lubrication and stock control of complex concrete product moulds.
Notes
Elements and Performance Criteria
1. Dismantle mould
- 1.1. Remove nuts and bolts as required
- 1.2. Remove mould
2. Clean and inspect mould
- 2.1. Identify product faults from visual inspection
- 2.2. Identify mould faults from visual inspection
- 2.3. Dismantle mould as per work instructions
- 2.4. Check condition of all mould parts
- 2.5. Clean mould parts
3. Reassemble mould
- 3.1. Identify product to be made
- 3.2. Interpret mould drawings/plans
- 3.3. Select and check required mould parts
- 3.4. Use correct mould setup jig
- 3.5. Assemble mould as per work instructions
- 3.6. Place and fix reinforcement cage as required
- 3.7. Check cover is adequate and fix or report as required
- 3.8. Check mould dimensions and tolerance
- 3.9. Check mould for joint leakage and correct if required
4. Lubricate mould
- 4.1. Lubricate mould to standard
- 4.2. Store mould in correct location
5. Maintain mould part stock control
- 5.1. Check stocks of spare parts
- 5.2. Advise supervisor of stock required, parts used and date of completed mould
6. Rectify routine problems
- 6.1. Identify the range of faults that can occur during the operation
- 6.2. Determine and rectify fault causes in accordance with procedures/work instructions
- 6.3. Identify and rectify equipment failure causes in accordance with procedures/work instructions
- 6.4. Ensure appropriate records and log books of equipment operations are maintained to meet procedures/work instructions
- 6.5. Identify non-routine problems and report to designated person
7. Control hazards
- 7.1. Identify hazards from the job to be done
- 7.2. Identify other hazards in the work area
- 7.3. Assess the risks arising from those hazards
- 7.4. Implement measures to control those risks in line with procedures
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Procedures
All operations are performed in accordance with standard procedures and work instructions
Typical problems
Typical problems may include:
recognition of parts requiring replacement (e.g. stretched rubber, missing bolts)
selection of appropriate mould parts to replace worn parts
interpretation of drawings and matching reinforcement and moulds to drawing
Occupational health and safety (OHS)
All operations are subject to stringent OHS requirements and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and OHS requirements, the OHS requirements take precedence
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Procedures
All operations are performed in accordance with standard procedures and work instructions
Typical problems
Typical problems may include:
recognition of parts requiring replacement (e.g. stretched rubber, missing bolts)
selection of appropriate mould parts to replace worn parts
interpretation of drawings and matching reinforcement and moulds to drawing
Occupational health and safety (OHS)
All operations are subject to stringent OHS requirements and these must not be compromised at any time. Where there is an apparent conflict between performance criteria and OHS requirements, the OHS requirements take precedence
EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
It is essential that the equipment be understood and that the importance of critical mould properties and dimensions is known. Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action.
Consistent performance should be demonstrated. In particular look to see that:
moulds are withdrawn for repair as required
moulds drawn from the mould store are in good order
stocks of spares are kept at appropriate levels
correct moulds are available for required jobs
mould is lubricated to standard
moulds are made consistently within an appropriate timeframe and with minimum faults
good OHS practice is used consistently.
Competence must be demonstrated in the operation of all ancillary equipment to the level required for this unit of competency.
Context of and specific resources for assessment
Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations.
Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.
Simulation or case studies/scenarios may be required to allow for timely assessment of parts of this unit of competency. Simulation should be based on the actual plant and will include 'walk-throughs' of the relevant competency components. A bank of scenarios/case studies/what ifs and questions will be required to probe the reasoning behind observable actions.
Method of assessment
Individual enterprises may choose to add prerequisites and co-requisites relevant to their processes.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed.
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
It is essential that the equipment be understood and that the importance of critical mould properties and dimensions is known. Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action.
Consistent performance should be demonstrated. In particular look to see that:
moulds are withdrawn for repair as required
moulds drawn from the mould store are in good order
stocks of spares are kept at appropriate levels
correct moulds are available for required jobs
mould is lubricated to standard
moulds are made consistently within an appropriate timeframe and with minimum faults
good OHS practice is used consistently.
Competence must be demonstrated in the operation of all ancillary equipment to the level required for this unit of competency.
Context of and specific resources for assessment
Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations.
Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.
Simulation or case studies/scenarios may be required to allow for timely assessment of parts of this unit of competency. Simulation should be based on the actual plant and will include 'walk-throughs' of the relevant competency components. A bank of scenarios/case studies/what ifs and questions will be required to probe the reasoning behind observable actions.
Method of assessment
Individual enterprises may choose to add prerequisites and co-requisites relevant to their processes.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W2668 | PMCOPS258A | Demould concrete products | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAH37 | PMC552058 | Demould concrete products | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W748 | PMC20110 | Certificate II in Manufactured Mineral Products | Qualification |
| W750 | PMC40110 | Certificate IV in Manufactured Mineral Products | Qualification |
| W749 | PMC30110 | Certificate III in Manufactured Mineral Products | Qualification |