Unit of competency Outline
Date retreived
22/07/2026 5:57 AM AWST
22/07/2026 5:57 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Monitor and adjust refrigeration energy management systems
Monitor and adjust refrigeration energy management systems
Unit of competency
National Code
UEERA0056
UEERA0056
State Code
OCB32
OCB32
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031315 - Refrigeration And Air Conditioning Mechanics
Original Release Date
12/07/2021
Nominal Hours
36
Description
This unit involves the skills and knowledge required to monitor and adjust refrigeration energy management systems.It includes setting up and adjusting energy management systems on refrigeration systems for effective energy use. It also includes working safely, testing and analysing system parameters, adjusting equipment and controls, following workplace procedures, and documenting final operating parameters and settings.The skills and knowledge described in this unit require a licence or permit to practice in the workplace where work is carried out on electrical installations which are designed to operate at voltages greater than 50 volt (V) alternating current (a.c.) or 120 V direct current (d.c.).Competency development activities in this unit are subject to regulations directly related to licensing. Where a licence or permit to practice is not held, skills and knowledge described in this unit require a relevant contract of training, such as an Australian Apprenticeship.Additional and/or other conditions may apply in some jurisdictions subject to regulations related to refrigeration, air conditioning or electrical work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations.Permits may also be required for some work environments, such as confined spaces, working aloft, near live electrical apparatus and site rehabilitation.
Notes
Elements and Performance Criteria
1 Prepare to monitor and adjust energy management systems on refrigeration system
- 1.1 WHS/OHS requirements and workplace procedures for a given work area are identified and applied
- 1.2 WHS/OHS risk control measures and workplace procedures are followed in preparation for refrigeration system work
- 1.3 Safety hazards not previously identified are noted on job safety assessment and established risk control measures implemented
- 1.4 Appropriate person/s is consulted to ensure refrigeration system work is coordinated effectively with others involved on the worksite
- 1.5 Refrigeration system energy parameters are identified by reviewing system specifications and component technical data
- 1.6 Tools, equipment and testing devices needed to carry out work are obtained and checked for correct operation and safety
- 1.7 Preparatory work is checked to ensure no damage has occurred and complies with job requirements
- 1.8 Need to test or measure live electrical work is determined in accordance with WHS/OHS requirements and workplace safety procedures
- 1.9 Circuits are checked and isolated in accordance with WHS/OHS requirements and workplace procedures
2 Monitor and adjust energy management systems on refrigeration system
- 2.1 WHS/OHS risk control measures and workplace procedures for carrying out refrigeration system work are followed
- 2.2 Testing/measuring devices are connected and set up in accordance with job requirements and refrigeration system
- 2.3 Monitoring and adjustments are made to equipment components and controls to provide effective energy use in accordance with refrigeration system specifications and regulatory requirements
- 2.4 Unplanned situations are responded to in accordance with workplace procedures, discussions with appropriate person/s and job specifications and requirements in a manner that minimises risk to personnel and equipment
- 2.5 Refrigeration system monitoring and adjusting is carried out efficiently without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy principles
3 Complete and report monitoring adjusting activities
- 3.1 WHS/OHS risk control work completion measures and workplace procedures are followed
- 3.2 Worksite is cleaned and made safe in accordance with workplace procedures
- 3.3 Monitoring and adjustment settings are documented and appropriate person/s notified in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| S7356 | UEENEEJ121A | Monitor and adjust refrigeration energy management systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BFP9 | UEE42720 | Certificate IV in Air Conditioning and Refrigeration Servicing | Qualification |
| BMB5 | UEE42725 | Certificate IV in Air Conditioning and Refrigeration Servicing | Qualification |
| BMB9 | UEE42825 | Certificate IV in Air-conditioning Systems Energy Management and Control | Qualification |
| BFL0 | UEE42820 | Certificate IV in Air-conditioning Systems Energy Management and Control | Qualification |