Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Commission wells and gathering systems
Commission wells and gathering systems
Unit of competency
National Code
PMAOPS434
PMAOPS434
State Code
AXM81
AXM81
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
05/08/2016
Field of Education
030303 - Mining Engineering
Original Release Date
05/08/2016
Nominal Hours
40
Description
This unit of competency covers the skills and knowledge required to commission a well, its gathering system and their associated systems. It applies to operational commissioning which takes place after pre-commissioning of equipment and systems; pre-commissioning is typically performed by a contractor or projects team.This unit of competency applies to senior operators, field technicians and those in similar roles who are required to apply in-depth knowledge of process and plant to in order to bring a new (or worked over/rejuvenated) well and its gathering system on line, make adjustments to ensure it is in steady operation and delivering at the required rate, balance the impact of the new well on the entire system, and ensure the system is ready to be handed over to a field operator for normal operation.This unit of competency includes all such items of equipment and unit operations which form part of the well/system. A unit comprises two or more components of plant/equipment that are operated together to produce product, including as appropriate to the facility:wellheadschokes and control valvesmetersflow lineshigh point ventslow point drainsvalves, including non-return and pressure/vacuum reliefpumps and their prime moversproduct separation unitsinstrumentation and control systems (variable speed drive (VSD) and proportional integral derivative (PID))testing equipmentpower unitsdrive headsflaresfuel gas systemschemical injection equipmentfield flaresstorage tanks.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare for work
- 1.1 Receive and give shift handover
- 1.2 Identify work requirements
- 1.3 Identify and control hazards
- 1.4 Coordinate with appropriate personnel
- 1.5 Check well and its gathering system is ready for commissioning
- 1.6 Determine appropriate schedule and priorities for work
2 Accept handover of well and gathering system
- 2.1 Ensure documents and other records provided match 'as is' plant and equipment
- 2.2 Check all issues have been satisfactorily resolved
- 2.3 Confirm status of individual items being handed over
- 2.4 Ensure plant and equipment are operationally sound and in accordance with contract
- 2.5 Accept handover when appropriate
- 2.6 Complete logs and reports in accordance with procedures
3 Commission well in accordance with procedures
- 3.1 Commission support systems
- 3.2 Commission wellhead and components
- 3.3 Make adjustments to bring well to stable operation
4 Commission gathering system in accordance with procedures
- 4.1 Commission support systems
- 4.2 Introduce product to gathering system
- 4.3 Check all equipment is operating correctly
- 4.4 Take action to solve problems
5 Monitor and adjust well and gathering system to meet production requirements
- 5.1 Take required readings
- 5.2 Ensure telemetry and controls are functional
- 5.3 Adjust downhole pump speed to maintain correct liquid level
- 5.4 Monitor nearby wells for impact of new well
- 5.5 Complete other site checks
- 5.6 Liaise with relevant operational personnel as required
- 5.7 Make appropriate adjustments to ensure new well is performing as required
- 5.8 Adjust new well and gathering system to balance the overall production to meet requirements
6 Finalise commissioning activities
- 6.1 Complete commissioning tasks as appropriate
- 6.2 Ensure identified faults are correctly logged/reported for action
- 6.3 Ensure incomplete tasks are scheduled for follow-up
- 6.4 Ensure all logs and reporting are complete and understood
- 6.5 Check all systems are operational and all relevant personnel are informed
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WC258 | PMAOPS434A | Commission wells and gathering systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAM7 | MSM40116 | Certificate IV in Process Manufacturing | Qualification |
| BAN5 | PMA50116 | Diploma of Process Plant Technology | Qualification |
| BAN0 | PMA40116 | Certificate IV in Process Plant Technology | Qualification |
| BAM9 | PMA60116 | Advanced Diploma of Process Plant Technology | Qualification |