Unit of competency Outline
Date retreived
23/07/2026 4:44 PM AWST
23/07/2026 4:44 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Monitor complex engineering surveying structures
Monitor complex engineering surveying structures
Unit of competency
National Code
CPPSIS6016A
CPPSIS6016A
State Code
D1555
D1555
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
28/10/2008
Field of Education
031101 - Surveying
Original Release Date
28/10/2008
Nominal Hours
120
Description
This unit of competency specifies the outcomes required to observe, monitor and process observation data for complex engineering surveying structures. It requires the ability to demonstrate highly specialised technical skills and to plan and execute project activity according to job specifications. Functions will entail complying with, and developing or amending, organisational guidelines.
Notes
Elements and Performance Criteria
1Organise project resources.
- 1.1 Characteristics of the operating environment and any special equipment or resource requirements are identified according to organisational guidelines.1.2 Details of technology and techniques to be used to collect data are noted in project specifications.1.3 Equipment is checked to be in good working order.1.4 Manufacturer specifications with regard to the use of equipment are complied with.1.5 Skills and knowledge are updated to accommodate changes in engineering project requirements.
2Develop the project plan.
- 2.1 Project objectives, deliverables, constraints and principal work activities are defined and documented according to written spatial data specifications and client requirements.2.2 Information is included in the plan relating to identified risks and contingencies, resources, technology details and techniques to be used to collect data in the specified format.2.3 Information on the validation process is specified in the plan to verify the integrity of required spatial data.2.4 Design is interpreted to identify surveying data components to be controlled or monitored.2.5 Hazards and risks in the work site are identified according to organisational guidelines and OHS and legislative requirements.2.6 Pertinent legal and statutorystandards are considered and adhered to.2.7 Organisation of appropriate resources, equipment, materials and transport required for the project is designated to relevant personnel.
3Manage the project.
- 3.1 Identified spatial components are measured.3.2 Measured spatial data is reduced to a project spatial reference system for comparison with design.3.3 Measurements are validated, recorded and processed according to project specifications.3.4 Work is scheduled to be completed within time available.3.5 Work is allocated to appropriate personnel and supervisory processes, checks and measures are implemented.
4Monitor the project.
- 4.1 Project management mechanisms are implemented to measure, record and report progress of activities in relation to agreed schedule and plans.4.2 Contingencies and constraints are managed to ensure project meets specifications.
- 4.3 Progress is reviewed throughout the project life cycle, with agreed changes implemented to ensure consistency with client needs, project scope, objectives and constraints.4.4 Quality assurance processes are implemented based on the project plan.
5Complete the project.
- 5.1 Completed work is checked against specifications.5.2 Required documentation is completed according to organisational guidelines.5.3 Relevant personnel and project team are informed of results according to organisational guidelines.5.4 Spatial data is archived according to project specifications.
6Review the project.
- 6.1 Project is reviewed against objectives.6.2 Project review findings are reported to stakeholders.
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE835 | CPPSIS6036A | Monitor complex engineering surveying structures | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W627 | CPP60109 | Advanced Diploma of Spatial Information Services | Qualification |