Unit of competency Outline

Date retreived
23/07/2026 1:05 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Assemble and install shopfront commercial entries bulkheads and components

Assemble and install shopfront commercial entries bulkheads and components

Unit of competency
National Code
CPCCSH3003A
State Code
W9517
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
28/03/2013
Field of Education
030113 - Cabinet Making
Original Release Date
28/03/2013
Nominal Hours
40
Description
This unit specifies the outcomes required to assemble component parts and fittings that form the total product fabrication for a shopfront structure.
Notes
Elements and Performance Criteria
1. Plan and prepare.
  • 1.1. Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
  • 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
  • 1.3. Signage and barricade requirements are identified and implemented.
  • 1.4. Tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability and any faults are rectified or reported prior to commencement.
  • 1.5. Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
  • 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
  • 1.7. Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority requirements, and are applied.
  • 1.8. Fittings and/or pre-assembled frames are unloaded carefully to protect finishes and are placed in well protected area until ready to reassemble.
2. Establish datum and plumb lines.
  • 2.1. Datum is struck for level as required for installation.
  • 2.2. Plumb lines are marked at all connecting points.
3. Prepare opening.
  • 3.1. Opening dimensions are checked in accordance with dimensions of fabrication and plumb lines are checked for similarity to original site measurement.
  • 3.2. Drawings are checked for position of lease line or where unavailable checked with building contractor.
  • 3.3. Protrusions are scraped, chipped and cut away to connecting points to facilitate installation.
  • 3.4. Narrowest part of opening is determined and sill packing is set up to specified level for installation that to conforms to AS2047 Windows in buildings.
4. Assemble shopfront.
  • 4.1. Fittings are placed into position to commence installation.
  • 4.2. Holes are pre-drilled for fixing positions suitable to connect to brickwork, timber and stone.
  • 4.3. Measurements of completed assembly are checked against opening and glazier is contacted for site measurements.
5. Fit bulkhead.
  • 5.1. Bulkhead is prepared for installation by drilling, cutting and routering holes and openings to accept fittings and fixtures.
  • 5.2. Scaffolding is erected to fit bulkhead into position.
  • 5.3. Bulkhead is raised into position using mechanical lifting equipment and secured to specifications using fixing methods required to securely support installation.
6. Install assembly.
  • 6.1. Door are checked for square to ensure glazier has blocked glass correctly and assembly is positioned into opening allowing it to rest on packing at highest position in floor.
  • 6.2. Datum line is transferred on assembly and position is measured and transferred to all connecting points.
  • 6.3. Assembly is installed to level using appropriate equipment for levelling process, plumbed off narrowest point of width and packed to position.
  • 6.4. Assembly is anchored at all connecting points to specifications, doors are fitted where applicable and glazier is contacted to notify that assembly is ready for glass installation.
  • 6.5. Door closures are checked to ensure that they face mount, floor or transom and that automatic and floor or head-fixed tracks operate freely.
  • 6.6. Closures, door furniture and scribe fillers are fitted and any remaining gaps are sealed with approved sealant.
  • 6.7. Sealants are applied to specification to protect against water, wind and dust penetration.
7. Clean up.
  • 7.1. Assembly is cleaned free from excess sealant, finger marks and masking tape.
  • 7.2. Waste and unwanted material are disposed of safely with any waste aluminium stored for recycling and any unused material stored/stacked.
  • 7.3. Tools and equipment are cleaned, maintained and stored.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
material safety data sheets (MSDS)
memos
regulatory and legislative requirements pertaining to assembling/installing shopfront commercial entries bulkheads and component fittings
relevant Australian standards
safe work procedures relating to assembling/installing shopfront commercial entries bulkheads and component fittings
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
hazard control
hazardous materials and substances
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
concealed services (water, power and gas)
lighting
restricted access barriers
traffic control
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment include:
air compressor and hoses
brushes
building line
chalk line
clamps
hammers
levelling equipment
measuring tapes and rules
nail guns
plumb bob
power drills
power leads
sash cramps
screwdrivers
spirit levels
squares
step ladders
straight edge.
Quality requirements include:
assembling procedures
attention to specifications of work
control of handling procedures
protection of material surfaces
quality of materials
relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications where specified
workplace operations and procedures
use and maintenance of equipment
workplace operations and procedures.
Materials include:
aluminium
timber.
Environmental requirements include:
clean-up management
dust and noise
stormwater protection
waste management.
Statutory and regulatory authority includes:
federal, state and local authorities administering applicable Acts, regulations and codes of practice.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to prepare and assemble all components of a shopfront, providing evidence of the ability to:
comply with OHS regulations applicable to workplace operations
apply organisational quality procedures and processes within context of setting out and fabricating a shopfront
identify details and specifications of nominated shopfront to be set out
accurately apply tools and equipment to set out and mark location of frame material thickness and components
accurately apply measuring devices to read and record dimensions, plumb and level
identify inconsistencies in dimensions, plumb and level recorded for notification to appropriate personnel
identify and select prepared materials for components
display sound procedures for the safe and accurate preparation of each component for assembling
select and use appropriate processes, tools and equipment for assembling components
demonstrate safe and efficient use of tools and equipment
demonstrate sound techniques in the safe and efficient assembly of components to form framework for shopfront
display sound and accurate fitting of component fittings to locations
complete assembly free of scratches, dents and blemishes
safely and efficiently disassemble components and fittings and identify for delivery and assembling instructions
identify typical faults and problems that occur and action required to rectify them
communicate with others to ensure safe and effective workshop operations.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
workshop location with appropriate area
tools and equipment appropriate to required tasks
materials and prepared components for assembly processes
drawings, specifications and documentation relevant to activity.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm a reasonable inference that competency is not only verified under the particular assessment circumstance, but is able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
AXQ40 BCF3018A Assemble/install shopfront, commercial entries and bulkheads, including components Unit of competency
Replaced By
State Code National Code Title Type
BBB04 CPCCSH3003 Assemble and install shopfront structures Unit of competency
State Code National Code Title Type
J489 CPC31812 Certificate III in Shopfitting Qualification
D407 CPC31811 Certificate III in Shopfitting Qualification