Unit of competency Outline
Date retreived
22/07/2026 9:33 PM AWST
22/07/2026 9:33 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Use resource planning software systems in manufacturing
Use resource planning software systems in manufacturing
Unit of competency
National Code
MEM30019A
MEM30019A
State Code
W5435
W5435
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
19/08/2014
Field of Education
030101 - Manufacturing Engineering
Original Release Date
19/08/2014
Nominal Hours
40
Description
This unit covers accessing and using Enterprise Resource Planning (ERP), Materials Requirement or Resource Planning (MRP) software systems in conjunction with Just in Time techniques.
Notes
Elements and Performance Criteria
1. Use software interface
- 1.1. Keyboards, track ball/mouse and monitor and/or other peripherals are used to access system.
- 1.2. The system and the screens are navigated.
- 1.3. Messages are acknowledged.
- 1.4. Information is processed in the required format.
2. Access information
- 2.1. Relevant data and information is obtained from the system.
- 2.2. The status of items in the system is identified.
- 2.3. Historical data and information are accessed.
- 2.4. Information is interpreted and actions are prioritised.
3. Take appropriate actions
- 3.1. Actions are taken in response to resource planning information.
- 3.2. Follow-up is conducted as appropriate to ensure anticipated results have occurred.
- 3.3. Adjustments and variations are recorded according to procedures.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
System
Includes ERP, MRP or similar software programs
Appropriate actions
Appropriate actions are actions in regard to production schedules, materials management, purchasing and ordering, transport and logistics that are needed as a result of information obtained from resource planning software
Resource planning information
May include information from ERP, MRP or similar systems that provide information on master production schedule, materials requirement plan, capacity requirement plan, bills of material, inventory control and statistics, order action, schedules
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
System
Includes ERP, MRP or similar software programs
Appropriate actions
Appropriate actions are actions in regard to production schedules, materials management, purchasing and ordering, transport and logistics that are needed as a result of information obtained from resource planning software
Resource planning information
May include information from ERP, MRP or similar systems that provide information on master production schedule, materials requirement plan, capacity requirement plan, bills of material, inventory control and statistics, order action, schedules
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
A person who demonstrates competency in this unit must be able to use ERP, MRP planning software systems in manufacturing. Competency in this unit cannot be claimed until all prerequisites have been satisfied.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Assessors must be satisfied that the candidate can competently and consistently perform all elements of the unit as specified by the criteria, including required knowledge, and to be capable of applying the competency in new and different situations and contexts.
Context of and specific resources for assessment
This unit may be assessed on the job, off the job or a combination of both on and off the job. Where assessment occurs off the job, that is, the candidate is not in productive work, then an appropriate simulation must be used where the range of conditions reflects realistic workplace situations. The competencies covered by this unit would be demonstrated by an individual working alone or as part of a team. The assessment environment should not disadvantage the candidate.
This unit could be assessed in conjunction with any other units addressing the safety, quality, communication, materials handling, recording and reporting associated with using ERP, MRP planning software systems in manufacturing, or other units requiring the exercise of the skills and knowledge covered by this unit.
Method of assessment
Assessors should gather a range of evidence that is valid, sufficient, current and authentic. Assessors must be satisfied that the candidate can competently and consistently perform all elements of the unit as specified by the criteria, including required knowledge, and to be capable of applying the competency in new and different situations and contexts. Evidence can be gathered through a variety of ways including direct observation, supervisor's reports, project work, samples and questioning. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency. The candidate will have access to all tools, equipment, materials and documentation required. The candidate will be permitted to refer to any relevant workplace procedures, product and manufacturing specifications, codes, standards, manuals and reference materials.
Guidance information for assessment
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
A person who demonstrates competency in this unit must be able to use ERP, MRP planning software systems in manufacturing. Competency in this unit cannot be claimed until all prerequisites have been satisfied.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Assessors must be satisfied that the candidate can competently and consistently perform all elements of the unit as specified by the criteria, including required knowledge, and to be capable of applying the competency in new and different situations and contexts.
Context of and specific resources for assessment
This unit may be assessed on the job, off the job or a combination of both on and off the job. Where assessment occurs off the job, that is, the candidate is not in productive work, then an appropriate simulation must be used where the range of conditions reflects realistic workplace situations. The competencies covered by this unit would be demonstrated by an individual working alone or as part of a team. The assessment environment should not disadvantage the candidate.
This unit could be assessed in conjunction with any other units addressing the safety, quality, communication, materials handling, recording and reporting associated with using ERP, MRP planning software systems in manufacturing, or other units requiring the exercise of the skills and knowledge covered by this unit.
Method of assessment
Assessors should gather a range of evidence that is valid, sufficient, current and authentic. Assessors must be satisfied that the candidate can competently and consistently perform all elements of the unit as specified by the criteria, including required knowledge, and to be capable of applying the competency in new and different situations and contexts. Evidence can be gathered through a variety of ways including direct observation, supervisor's reports, project work, samples and questioning. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency. The candidate will have access to all tools, equipment, materials and documentation required. The candidate will be permitted to refer to any relevant workplace procedures, product and manufacturing specifications, codes, standards, manuals and reference materials.
Guidance information for assessment
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OEV97 | MEM30019 | Use resource planning software systems in manufacturing | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J368 | MEM60112 | Advanced Diploma of Engineering | Qualification |
| W249 | MEM60105 | Advanced Diploma of Engineering | Qualification |
| J367 | MEM50212 | Diploma of Engineering - Technical | Qualification |
| W240 | MEM30505 | Certificate III in Engineering - Technical | Qualification |
| W248 | MEM50205 | Diploma of Engineering - Technical | Qualification |
| J159 | MEM40412 | Certificate IV in Engineering Drafting | Qualification |
| W524 | MSA40108 | Certificate IV in Manufacturing Technology | Qualification |
| W528 | MSA60108 | Advanced Diploma of Manufacturing Technology | Qualification |
| W522 | MSA30208 | Certificate III in Manufacturing Technology | Qualification |
| W526 | MSA50108 | Diploma of Manufacturing Technology | Qualification |