Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Maintain interdependent network protection and control systems

Maintain interdependent network protection and control systems

Unit of competency
National Code
UETDRTS017
State Code
ODN91
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
20/09/2021
State Implementation and Classification
Approved Date
21/12/2021
Field of Education
031317 - Electronic Equipment Servicing
Original Release Date
21/12/2021
Nominal Hours
135
Description
This unit covers the maintenance of network protection and control in interdependent situations and includes isolation, inspection, monitoring, testing, adjustment, and repair, refurbishment and/or overhaul and functional checks of interdependent network protection and control systems. It includes the requirements to prove the functionality of interdependent and discrete schemes, such as circuit breaker fail, master-controlled earth fault, inter-tripping, blocking, synchronising, pilot wire, phase comparison, load shedding, voltage control, parallel operation and load rejection.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace subject to regulations for undertaking of electrical work. Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Plan for the maintenance of network protection and control systems (interdependent)
  • 1.1 Work health and safety (WHS)/occupational health and safety (OHS) practices/procedures and environmental and sustainable energy procedures, which may influence the maintenance of network protection and control systems (interdependent), are reviewed and determined
  • 1.2 Purpose of the maintenance of network protection and control systems (interdependent) is established after data is analysed and expected outcomes of the work are confirmed with appropriate personnel
  • 1.3 Organisational established procedures on policies and specifications for the maintenance of network protection and control systems (interdependent) are obtained or established with appropriate personnel
  • 1.4 Testing procedures are discussed with/directed to appropriate personnel in order to ascertain the project brief
  • 1.5 Testing parameters are established from organisational established procedures on policies and specifications
  • 1.6 Equipment/tools and personal protective equipment (PPE) are selected based on specified performance criteria and established procedures
  • 1.7 Work roles and tasks are allocated according to requirements and individual competencies
  • 1.8 Work is prioritised and sequenced for the most efficient/effective outcome, completed within an acceptable timeframe, to a quality standard and in accordance with established procedures
  • 1.9 Liaison and communication issues with others/authorised personnel, authorities, clients and landowners are resolved and activities coordinated to carry out work
  • 1.10 Risk control measures are identified, prioritised and evaluated against the work schedule
  • 1.11 Relevant work permits are secured to coordinate the performance of work according to requirements and/or established procedures
2 Carry out the maintenance of network protection and control systems (interdependent)
  • 2.1 Circuit/systems modelling is used to evaluate alternative proposals in accordance with established procedures
  • 2.2 WHS/OHS and sustainable energy principles, functionality and practices to reduce the incidents of accidents and minimise waste are incorporated into the project in accordance with requirements and/or established procedures
  • 2.3 Maintenance of network protection and control systems (interdependent) decisions are made on the basis of safety and effective outcomes according to requirements and/or established procedures
  • 2.4 Mathematical and/or engineering models of the scheme are used to analyse the effectiveness of the finished project in accordance with requirements and established procedures
  • 2.5 Technical advice is given regarding potential hazards, safety risks and control measures so that monitoring and preventative action can be undertaken and/or appropriate authorities consulted, where necessary, in accordance with requirements and established procedures
  • 2.6 Essential knowledge and associated skills are applied to analyse specific data and compare it with compliance specifications to ensure completion of the project within an agreed timeframe according to requirements
  • 2.7 Testing of network protection and control systems (interdependent) is undertaken according to requirements and established procedures
  • 2.8 Work teams/groups are arranged/coordinated/evaluated to ensure planned goals are met according to established procedures
  • 2.9 Solutions to non-routine problems are identified and actioned, using acquired essential knowledge and associated skills, according to requirements
  • 2.10 Quality of work is monitored against personal performance agreement and/or established organisational and professional standards
  • 2.11 Strategic plans are developed incorporating organisation initiatives in accordance with established procedures
3 Complete the maintenance of network protection and control systems (interdependent)
  • 3.1 Final inspections of the network protection and control systems (interdependent) are undertaken to ensure they comply with all requirements and include all specifications and documentations needed to complete the project
  • 3.2 Appropriate personnel are notified of completion and reports and/or completion documents are finalised/commissioned
  • 3.3 Reports and/or completion documents are submitted to relevant personnel/organisations for approval and, where applicable, statutory or regulatory approval
  • 3.4 Approved copies of the maintenance of network protection and control systems (interdependent) documents are issued and records are updated in accordance with established procedures
No information
No information
Replaces
State Code National Code Title Type
OBG56 UETTDRTS21 Maintain interdependent network protection and control systems Unit of competency
Replaced By
State Code National Code Title Type
OEF13 UETDRTS033 Commission and maintain network protection and control systems Unit of competency