Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install air conditioning control equipment
Install air conditioning control equipment
Unit of competency
National Code
CPCPMS3038
CPCPMS3038
State Code
OCM68
OCM68
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
031315 - Refrigeration And Air Conditioning Mechanics
Original Release Date
01/06/2021
Nominal Hours
8
Description
This unit specifies the skills and knowledge required to install air conditioning control equipment for the control of pressure, temperature, flow rate, humidity and density. Site location for work application may be either domestic or commercial and may be a new work site or an existing structure being renovated, extended, restored or maintained In some jurisdictions, this unit of competency may form part of accreditation, licensing, legislative, regulatory or certification requirements.
Notes
Elements and Performance Criteria
1 Prepare for work.
- 1.1 Access and read job plans and specifications.
- 1.2 Identify and apply workplace policies and procedures, work health and safety (WHS) and environmental requirements.
- 1.3 Apply quality assurance requirements in accordance with workplace requirements.
- 1.4 Plan and sequence tasks in conjunction with others.
- 1.5 Prepare work area to support efficient installation of air conditioning control equipment.
- 1.6 Select appropriate tools and equipment including personal protective equipment (PPE) and check for serviceability.
- 1.7 Identify materials and equipment required to complete the task.
2 Identify system requirements.
- 2.1 Create a materials list and collect materials.
- 2.2 Identify fabrication requirements from job plans, specifications and relevant information.
- 2.3 Calculate quantity and type of materials and components.
3 Install control equipment.
- 3.1 Shut down and isolate air conditioning system according to appropriate codes of practice and WHS requirements.
- 3.2 Install control equipment to job specification or manufacturer’s instructions and report faults, as required.
- 3.3 Position control equipment in specified location without damage or distortion to surrounding environment or other services.
- 3.4 Calibrate control equipment according to manufacturer recommendations and job specifications.
- 3.5 Check correct operation of system control equipment against operational specification.
4 Clean up.
- 4.1 Clear the work area, and dispose of, reuse or recycle materials in accordance with state and territory legislation and workplace policies and procedures.
- 4.2 Clean tools and equipment, check for serviceability reporting any damage, store and secure.
- 4.3 Complete documentation according to workplace requirements.
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WF921 | CPCPMS3038A | Install air conditioning control equipment | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGC2 | CPC32420 | Certificate III in Plumbing | Qualification |