Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install mobile generation set for synchronised LV Genset
Install mobile generation set for synchronised LV Genset
Unit of competency
National Code
UETTDRIS61
UETTDRIS61
State Code
OBH54
OBH54
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
04/12/2019
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
04/12/2019
Nominal Hours
45
Description
This unit involves the skills and knowledge required to install mobile generation set for synchronised low voltage (LV) Genset in the electricity supply industry (ESI).It includes installing temporary portable generation sets to LV distribution assets to maintain supply. It also includes operating, connecting and disconnecting generators and estimating LV load and selecting the appropriate generator for required outcome.The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Plan to install mobile generation set for synchronised LV Genset
- 1.1 Work schedules, construction plans, drawings, workplace procedures and material lists are received and confirmed
- 1.2 Job requirements and workplace procedures are identified and communicated with relevant personnel
- 1.3 Work health and safety (WHS)/occupational health and safety (OHS), policies and procedures related to the work are used and actioned to ensure safe systems of work are followed.
- 1.4 Work is prioritised and sequenced for completion within acceptable timeframes following consultation with relevant personnel and in accordance with workplace procedures
- 1.5 Hazards are identified, WHS/OHS risks assessed and control measures identified in accordance with workplace procedures
- 1.6 Relevant work permits are obtained, understood and signed in accordance with workplace procedures
- 1.7 Plant, equipment, tools and personal protective equipment (PPE) required for work are identified, obtained and confirmed in working order
- 1.8 Clients/customers are provided with alternative options within scope, acceptable cost and job requirements
- 1.9 Worksite is prepared to minimise risk, damage to property, commerce and individuals in accordance with workplace procedures
- 1.10 Traffic management plan is confirmed as being applied in accordance with workplace procedures
2 Carry out the installation of mobile generation set for synchronised LV Genset
- 2.1 WHS/OHS, sustainable energy and environmental principles and practices are monitored and followed to reduce incidents in accordance with workplace procedures
- 2.2 First aid and other related work procedures are performed in accordance with job requirements and/or workplace procedures
- 2.3 Requirements for lifting and/or climbing and/or working at heights and the use of power tools/equipment are followed in accordance with workplace procedures
- 2.4 Remedial actions are taken to overcome shortfalls in work schedule in accordance with job requirements and workplace procedures
- 2.5 The installation of mobile generation set for synchronised LV genset is carried out in accordance with the work schedule, job requirements and workplace procedures
- 2.6 Installation of mobile generation set for synchronised LV Genset is completed in agreed timeframes, to quality standards and with a minimum of waste in accordance with workplace procedures
- 2.7 Solutions used to solve problems are identified and actioned in accordance with workplace procedures
- 2.8 Quality checks of work are undertaken in accordance with workplace procedures
3 Complete installation of mobile generation set for synchronised LV Genset
- 3.1 Completed work is checked against work schedule, construction plans and drawings for compliance and anomalies are reported in accordance with workplace procedures
- 3.2 WHS/OHS and environmental incidents are reported in accordance with workplace procedures, as required
- 3.3 Worksite is rehabilitated, cleaned up and made safe in accordance with workplace procedures
- 3.4 Tools, equipment and surplus resources and materials are, where appropriate, cleaned, checked and returned to storage in accordance with workplace procedures
- 3.5 Relevant work permits are signed off and synchronised LV Genset apparatus is returned to service in accordance with workplace procedures
- 3.6 Work records, reports and/or documentation are completed in accordance with workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WD687 | UETTDRIS61A | Install mobile generation set for synchronised LV Genset | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| ODN27 | UETDRIS015 | Install low voltage mobile generator | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BEV6 | UET40419 | Certificate IV in ESI - Network Systems | Qualification |
| BEV2 | UET30819 | Certificate III in ESI - Power Systems - Distribution Cable Jointing | Qualification |
| BEW0 | UET30619 | Certificate III in ESI - Power Systems - Distribution Overhead | Qualification |
| BEV8 | UET30719 | Certificate III in ESI - Power Systems - Rail Traction | Qualification |
| BEW4 | UET30519 | Certificate III in ESI - Power Systems - Transmission Overhead | Qualification |