Unit of competency Outline

Date retreived
22/07/2026 2:15 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Provide field support services

Provide field support services

Unit of competency
National Code
CPPSIS3006A
State Code
D1491
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
07/04/2011
State Implementation and Classification
Approved Date
24/08/2011
Field of Education
031101 - Surveying
Original Release Date
24/08/2011
Nominal Hours
40
Description
This unit of competency specifies the outcomes required to provide field support services. It requires the ability to work with others on site to perform key organisational requirements within a spatial information services framework, working from site drawings and specifications. Functions would be carried out under supervision, often in a team environment, and within organisational guidelines.
Notes
Elements and Performance Criteria
1Plan and prepare for support task.
  • 1.1 Requirements of the job are clarified with relevant personnel according to organisational guidelines.1.2 Tools, equipment and supplies appropriate to the environment are selected and prepared according to specifications.1.3 Safety requirements for the protection of site personnel, the public and the environment are determined.1.4 Plans are examined to determine the location of services.1.5 Personal protective equipment is used according to OHS guidelines.1.6 Skills and knowledge are updated to accommodate changes in field support services.
2Execute support tasks.
  • 2.1 Barricades, protective works and signs are erected, when required according to organisational guidelines.2.2 Surface positions are determined and marked according to accepted standards using information available from site drawings and references, and relevant personnel.2.3 Support tasks are carried out under direction and according to specifications.2.4 Skills and knowledge are updated to accommodate changes in equipment and operating procedures.
3Finalise the task.
  • 3.1 Site is restored as near as practicable to original condition.3.2 Tools and equipment are cleaned and stored in a secure location.3.3 Repair work is organised for unsafe or faulty tools and equipment.3.4 All required spatial business documentation is completed accurately and promptly according to organisational guidelines.
No information
No information
Replaces
State Code National Code Title Type
C5199 PRDSIS10A Provide field support services Unit of competency
Replaced By
State Code National Code Title Type
WE763 CPPSIS3016A Provide field support services Unit of competency