Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Manage well completion and abandonment
Manage well completion and abandonment
Unit of competency
National Code
RIIOGD508D
RIIOGD508D
State Code
WH532
WH532
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
30/05/2014
Field of Education
030303 - Mining Engineering
Original Release Date
30/05/2014
Nominal Hours
40
Description
This unit describes a participant’s skills and knowledge required to apply manage well completion and abandonment in Drilling. This unit is appropriate for those working in supervisory roles.No licensing, legislation, or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan and prepare for managing well completion and abandonment
- 1.1 Access, interpret and apply documentation for managing well completion and abandonment and ensure the work activity is compliant
- 1.2 Obtain, read, interpret, clarify and confirm work requirements
- 1.3 Identify and address potential hazards, risks and environmental issues and implement control measures
- 1.4 Select and wear personal protective equipment appropriate to the work activities
- 1.5 Resolve coordination requirements with others at the site prior to commencing, during and on completion of work activities
2. Organise completion schedule
- 2.1 Develop completion schedule in line with drilling contract and well prognosis
- 2.2 Review and confirm lease details, as necessary notifications are forwarded to statutory, company, owner and contractor representatives
- 2.3 Make preparations for release of rig and complete tour book records
- 2.4 Ensure arrangements are in place prior to the move, for work orders and invoicing in line with contract requirements and servicing/maintenance repairs of equipment
3. Complete well abandonment
- 3.1 Make preparations to stack, move and communicate to all parties
- 3.2 Access, interpret, confirm and implement environmental plan requirements
- 3.3 Ensure mud drilling fluids and waste storage/disposal requirements, and records are completed and processed
- 3.4 Prepare shutdown list and communicate to crew for actioning
- 3.5 Rig down ensuring that equipment, camp and rig are secured for removal
- 3.6 Review contract requirements, complete records
4. Oversee housekeeping activities
- 4.1 Clean, check, maintain and store plant, tools and equipment
- 4.2 Report issues identified with plant, tools and equipment
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WB220 | RIIOGD508A | Manage well completion and abandonment | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AZF2 | RII50815 | Diploma of Drilling Oil & Gas (On shore) | Qualification |
| J646 | RII50813 | Diploma of Drilling Oil & Gas (On shore) | Qualification |
| BFH5 | RII50820 | Diploma of Drilling Oil & Gas (Onshore) | Qualification |
| BFI1 | RII51020 | Diploma of Well Servicing Operations | Qualification |