Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install acoustic and thermal environmental protection systems
Install acoustic and thermal environmental protection systems
Unit of competency
National Code
CPCCPB3015A
CPCCPB3015A
State Code
W9455
W9455
TGA Status
Replaced
Replaced
DTWD Status
Transition (Replaced)
Transition (Replaced)
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040313 - Ceiling, Wall And Floor Fixing
Original Release Date
20/06/2014
Nominal Hours
20
Description
This unit of competency specifies the outcomes required to install wall and ceiling systems that satisfy environmental requirements in terms of acoustic ratings and energy efficiency ratings in accordance with sustainable building practices.It includes planning and preparation for work, installation of insulation to wall cavities and plenum, installation of acoustic systems and completion of post work clean-up activities.
Notes
Elements and Performance Criteria
1. Plan and prepare.
- 1.1. Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
- 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
- 1.3. Signage and barricade requirements are identified and implemented.
- 1.4. Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
- 1.5. Material quantity requirements are calculated in accordance with plans and specifications and quality requirements.
- 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- 1.7. Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.
2. Install blanket insulation to walls.
- 2.1. Stud configuration is identified for installation processes.
- 2.2. Safety wire mesh is installed to plans and specifications.
- 2.3. Insulating blanket is installed in full length runs where practicable or, if joined, joints are made at centre of frame member, according to plans and specifications.
- 2.4. Adjacent runs of blanket insulation is abutted with closed joints.
3. Install acoustic systems.
- 3.1. Acoustic materials are selected to manufacturer specifications for the walls and ceiling.
- 3.2. Sheeting or ceiling tile material is selected for use in buildings requiring acoustic properties in accordance with manufacturers' weighted sound reduction index (RW rating).
- 3.3. Plaster sheeting and acoustic tile materials are fixed to walls and ceiling in accordance with specifications.
- 3.4. Sealant is selected and used to manufacturer specifications.
4. Clean up.
- 4.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- 4.2. Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to installing acoustic and thermal environmental protection systems
relevant Australian standards
safe work procedures relating to installing acoustic and thermal environmental protection systems
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
hazard control
hazardous materials and substances
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
cutting tools
lighting
manual handling
traffic control
restricted access barriers
trip hazards
power sources and leads
power tools
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment:
include:
broad knives
caulking guns
electric screw guns
etting boxes
hammers
manual levelling devices
measuring tapes and rules
nail bags
power drills
power leads
power saws
screwguns
spanners
spirit levels
squares
tin snips
trestles
trowels
may include:
C clamps
air compressors and hoses
docking saw and drop saws
laser levelling devices
masonry drills
nail guns
pop riveters
saw stools
system scaffolding and planks.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Materials include:
acoustic ceiling products
adhesive
fibrous plaster
insulation blankets
jointing tape
loose fill insulation
metal and aluminium type products
nails
plasterboard
polystyrene sheets
rigid sheet insulation
screws
sealants
staples
steel safety mesh.
Environmental requirements include:
clean-up management
dust and noise
vibration
waste management.
Installation includes:
acoustic and energy insulation materials
acoustic ceiling tiles and sheets
fibre cement sheeting
fixing of plasterboard
metal pan type ceiling cladding
plaster products.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to installing acoustic and thermal environmental protection systems
relevant Australian standards
safe work procedures relating to installing acoustic and thermal environmental protection systems
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
hazard control
hazardous materials and substances
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
cutting tools
lighting
manual handling
traffic control
restricted access barriers
trip hazards
power sources and leads
power tools
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment:
include:
broad knives
caulking guns
electric screw guns
etting boxes
hammers
manual levelling devices
measuring tapes and rules
nail bags
power drills
power leads
power saws
screwguns
spanners
spirit levels
squares
tin snips
trestles
trowels
may include:
C clamps
air compressors and hoses
docking saw and drop saws
laser levelling devices
masonry drills
nail guns
pop riveters
saw stools
system scaffolding and planks.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Materials include:
acoustic ceiling products
adhesive
fibrous plaster
insulation blankets
jointing tape
loose fill insulation
metal and aluminium type products
nails
plasterboard
polystyrene sheets
rigid sheet insulation
screws
sealants
staples
steel safety mesh.
Environmental requirements include:
clean-up management
dust and noise
vibration
waste management.
Installation includes:
acoustic and energy insulation materials
acoustic ceiling tiles and sheets
fibre cement sheeting
fixing of plasterboard
metal pan type ceiling cladding
plaster products.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively operate and use tools, plant and equipment
communicate and work effectively and safely with others
complete not less than three installation tasks which cover acoustic and thermal protection systems, in accordance with regulatory requirements and related specifications.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
workplace location or simulated workplace
materials relevant to the installation of acoustic and thermal protection systems
hand and power tools and equipment appropriate to the installation of acoustic and thermal protection systems
realistic activities covering the mandatory task requirements
specifications and work instructions.
Assessment of this unit of competency may be in conjunction with assessment of other units commonly performed at the same time in normal job roles.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively operate and use tools, plant and equipment
communicate and work effectively and safely with others
complete not less than three installation tasks which cover acoustic and thermal protection systems, in accordance with regulatory requirements and related specifications.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
workplace location or simulated workplace
materials relevant to the installation of acoustic and thermal protection systems
hand and power tools and equipment appropriate to the installation of acoustic and thermal protection systems
realistic activities covering the mandatory task requirements
specifications and work instructions.
Assessment of this unit of competency may be in conjunction with assessment of other units commonly performed at the same time in normal job roles.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W1917 | BCGWC3006B | Install acoustic and thermal environmental protection systems | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCQ26 | CPCCPB3015 | Install acoustic and thermal environmental protection systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J790 | CPC32813 | Certificate III in Fire Protection | Qualification |
| J485 | CPC20812 | Certificate II in Metal Roofing and Cladding | Qualification |
| J787 | CPC32413 | Certificate III in Plumbing | Qualification |
| J788 | CPC32513 | Certificate III in Plumbing (Mechanical Services) | Qualification |
| J493 | CPC32612 | Certificate III in Roof Plumbing | Qualification |
| 3724 | 52664WA | Certificate III in Wall and Ceiling Fixing (Housing) | Accredited course |
| 1472 | 52208 | Certificate III in Wall and Ceiling Fixing (Housing) | Accredited course |
| D401 | CPC31211 | Certificate III in Wall and Ceiling Lining | Qualification |