Unit of competency Outline
Date retreived
23/07/2026 7:08 AM AWST
23/07/2026 7:08 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Coordinate and implement stock preparation system shutdown
Coordinate and implement stock preparation system shutdown
Unit of competency
National Code
PPMSPR330
PPMSPR330
State Code
AXF41
AXF41
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
25/08/2016
Field of Education
030717 - Plant And Machine Operations
Original Release Date
25/08/2016
Nominal Hours
40
Description
This unit of competency describes the skills and knowledge required to implement, assess and record stock preparation system shutdowns, in a pulp or paper manufacturing facility.The unit applies to production operators and technicians who coordinate and implement stock preparation system shutdowns, in the stock preparation area. This typically involves working in a facility with complex integrated equipment and continuous operations.No licensing, legislative, regulatory, or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Assess causes and effects of shutdown
- 1.1 Coordinate planned shutdown of stock preparation systems from work area instructions or maintenance schedules
- 1.2 Assess causes of stock preparation system shutdown according to productivity requirements, environmental sustainability procedures, workplace health and safety and standard operating procedures (SOP) including the use of appropriate personal protective equipment, risks and hazards identification and housekeeping requirements
- 1.3 Identify and locate cause of unplanned shutdown
- 1.4 Assess effects of unplanned shutdown to determine impact on operations
- 1.5 Communicate unplanned shutdown according to organisational procedures
2. Implement shutdown procedures
- 2.1 Implement planned shutdown and check equipment
- 2.2 Respond to and rectify unplanned shutdown
- 2.3 Implement isolation requirements, according to work health and safety and SOP
- 2.4 Communicate shutdown information to relevant personnel
3. Record and report shutdown information
- 3.1 Record shutdown information, including corrective action
- 3.2 Report shutdown information to relevant personnel
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| AUY47 | FPPSPR330A | Co-ordinate and implement stock preparation system shutdown | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| ODU03 | PPMSPR301 | Perform stock preparation operations | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAH4 | PPM20116 | Certificate II in Pulping Operations | Qualification |
| BAH1 | PPM30116 | Certificate III in Pulping Operations | Qualification |