Unit of competency Outline

Date retreived
23/07/2026 1:06 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Cut and install timber flooring materials to stairs

Cut and install timber flooring materials to stairs

Unit of competency
National Code
LMFFL3502A
State Code
W8580
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
11/05/2009
State Implementation and Classification
Approved Date
16/06/2009
Field of Education
040321 - Floor Coverings
Original Release Date
16/06/2009
Nominal Hours
36
Description
This unit specifies the outcomes required to install timber flooring materials to stairs and steps.
Notes
Elements and Performance Criteria
1. Prepare materials for installation
  • 1.1. Applicable legislative, OHS and organisational requirements relevant to the installing timber flooring materials to stairs and steps are verified and complied with
  • 1.2. Instructions and/or plans are read and interpreted to identify process required to complete work tasks
  • 1.3. Floor condition is assessed for suitability for installation of timber flooring to stairs
  • 1.4. Stairway or step are measured and the required amount flooring materials is calculated
  • 1.5. Suitable adhesives, trims and accessories are selected if required
  • 1.6. Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition
  • 1.7. Sequence of work is planned, including a starting point, to ensure efficiency and quality of installation
2. Set out materials for installation
  • 2.1. Timber flooring to be installed is checked against order
  • 2.2. Timber flooring is acclimatised according to manufacturer recommendations
  • 2.3. Materials for fixing is organised and used in accordance with relevant safety management requirements
  • 2.4. Working lines and starting point are established
3. Lay out flooring material
  • 3.1. Instructions and sequence for laying and fixing are followed
  • 3.2. Materials are laid out to meet any design and specification requirements and minimise waste
  • 3.3. The aesthetics of the materials are maximised including matching grains and colours
  • 3.4. Underlay (if required) is checked against specified type, manufacturer recommendations and fitting
  • 3.5. Any remedial work to stairway is carried out
4. Install flooring material
  • 4.1. Flooring materials are cut following workplace procedures
  • 4.2. Underlay (if required) is installed following manufacturer recommendations
  • 4.3. Fixing methods and equipment are used following manufacturer recommendations
  • 4.4. Flooring materials are installed to specifications to the sub floor following workplace procedures
  • 4.5. Finished stairway is checked for flaws in installation and materials and faults rectified
5. Complete housekeeping
  • 5.1. Unused materials are stored or recycled as required
  • 5.2. Tools and equipment are cleaned and stored appropriately
  • 5.3. Work area is cleaned and rubbish is disposed of appropriately
  • 5.4. Workplace documentation is completed
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Legislative requirements
are to be in accordance with applicable legislation from all levels of government that affect organisational operation. Requirements may include but not be limited to award and enterprise agreements, industrial relations, Australian Standards, confidentiality and privacy, OHS, the environment, equal opportunity, anti-discrimination, relevant industry codes of practice, duty of care and heritage
OHS requirements
are to be in accordance with Commonwealth, State or Territory legislation and regulations, organisational safety policies and procedures. Requirements may include but not be limited to the use of personal protective equipment and clothing, fire fighting equipment, First Aid equipment, hazard and risk control and elimination, control of hazardous materials and substances, manual handling including lifting and carrying
Organisational requirements
may include but not be limited to legal, organisational and site guidelines, policies and procedures relating to own role and responsibility, quality assurance, procedural manuals, quality and continuous improvement processes and standards, OHS, emergency and evacuation, ethical standards, recording and reporting, access and equity principles and practices, equipment use, maintenance and storage, environmental management (waste disposal, recycling and re-use guidelines)
Timber flooring materials
may include cork, parquetry, floating floors and strip timber floors (non-structural)
Stairs and steps
may include but are not limited to open newel, bullnose steps, circular, recessed steps, open tread, box steps and kite winder treads
Instructions
Workplace procedures relating to the use and operation of tools and equipment
Workplace instructions, instructions, including job sheets, plans, drawings and designs
Workplace procedures relating to reporting and communications
Manufacturer instructions for the use of equipment and materials
Tools and equipment
are to include hammer, compressor, staple gun, bar scriber, utility knife, straight edge, drill, hand saw, chisels, drop saw, nail gun, planer, circular saw and combination saw
Materials
may include but not be limited to cork, parquetry, floating floor and strip flooring materials, underlay, adhesives, nails, trims, nosing and accessories








EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Critical aspects for assessment and evidence required to demonstrate competency in this unit
Comply with legislation, regulations, standards, codes of practice and established safe practices and procedures for installing timber flooring materials to stairs
Interpret work order and locate and apply relevant information
Apply safe handling requirements for equipment, products and materials, including the use of personal protective equipment
Follow work instructions, operating procedures and inspection practices to:
prevent damage to goods, equipment and products
maintain required production output and product quality
minimise the risk of injury to self and others
conduct appropriate moisture testing
Complete a minimum of three types of the timber flooring material installation to stairs from the following different options:
floating
strip timber flooring
cork
parquetry
Work effectively with others
Modify activities to cater for variations in workplace contexts and environment

Context of, and specific resources for assessment
The application of competency is to be assessed in the workplace or realistically simulated workplace
Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints
Assessment of essential underpinning knowledge, other than confirmatory questions, will usually be conducted in an off-site context
Assessment is to comply with relevant regulatory or Australian Standards requirements
The following resources should be made available:
a realistic installation requirement
workplace location or simulated workplace
materials and equipment relevant to the installation of timber flooring materials to stairs
specifications and work instructions

Method of assessment
Assessment must satisfy the endorsed assessment guidelines of the Furnishing Industry Training Package
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge
Assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure its correct interpretation and application
Assessment may be applied under project related conditions (real or simulated) and require evidence of process
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances
Assessment may be in conjunction with assessment of other units of competency


Replaces
State Code National Code Title Type
W0211 LMFFC3033A Cut and install timber flooring materials to stairs Unit of competency
Replaced By
State Code National Code Title Type
WI387 MSFFL3030 Cut and install timber flooring materials to stairs Unit of competency
State Code National Code Title Type
W506 LMF31208 Certificate III in Flooring Technology Qualification