Unit of competency Outline
Date retreived
23/07/2026 12:59 AM AWST
23/07/2026 12:59 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install split air conditioning systems and associated pipework
Install split air conditioning systems and associated pipework
Unit of competency
National Code
MEM10013
MEM10013
State Code
OAV72
OAV72
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
Field of Education
031315 - Refrigeration And Air Conditioning Mechanics
Original Release Date
Nominal Hours
36
Description
This unit of competency defines the skills and knowledge required to install split air conditioning systems and associated pipework up to 18 kW cooling capacity.This unit refers to plug in applications only. Where the installation and connection to mains supply of fixed wiring is necessary then this work must be undertaken by a suitably licensed person. Where commissioning and decommissioning of split air conditioning systems is required see unit MEM18084 Commission and decommission split air conditioning systems.Some jurisdictions may require the holder of this unit to be licensed or certified and users should check with the relevant authorities.Band: AUnit Weight: 6
Notes
Elements and Performance Criteria
1 Determine job requirements
- 1.1 Follow standard operating procedures (SOPs)
- 1.2 Comply with work health and safety (WHS) requirements at all times
- 1.3 Use appropriate personal protective equipment (PPE) in accordance with SOPs
- 1.4 Identify job requirements from specifications, drawings, job sheets or work instructions
2 Locate split air conditioning components
- 2.1 Determine the location of unit components, piping and drains in consultation with customer and other site considerations
- 2.2 Ensure industry and local authority requirements, standards and codes and manufacturer requirements are identified, including the appropriate capacity rating of the equipment and any impacts on the installation are identified
3 Inspect and prepare installation sites
- 3.1 Carry out all work safely to Australian Standards, state and local codes and regulations
- 3.2 Prepare the installation site to industry codes of practice and manufacturer installation instructions, as appropriate
- 3.3 Carry out the work without damage to the system, components and the surrounding environment or services
4 Prepare split system equipment and materials for installation
- 4.1 Identify and note safety hazards and ensure established risk control measures are implemented
- 4.2 Consult appropriate personnel to ensure the work is coordinated effectively with others involved on the worksite
- 4.3 Check all components, piping and fittings for conformance to manufacturer specification, job requirements and applicable standards
- 4.4 Determine the layout of the pipework from job specifications and diagrams
- 4.5 Obtain materials needed to carry out the work in accordance with established procedures and check against job requirements
- 4.6 Obtain tools, equipment and testing devices needed to conduct the work in accordance with established procedures and check for correct operation and safety
- 4.7 Check preparatory work to ensure no damage has occurred and that it complies with work requirements
5 Prepare and install refrigerant pipework
- 5.1 Use tools and equipment in accordance with manufacturers’ instructions
- 5.2 Ensure pipework is prepared and joined to required specification with minimal wastage and damage/contamination to environment
- 5.3 Join pipework and fittings using appropriate pipe joining methods
- 5.4 Ensure pipes are run separately and insulated according to manufacturer instructions and to relevant standards codes and regulations
- 5.5 Check pipework and joins for compliance and integrity using appropriate testing methods
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WA007 | MEM10013A | Install split air conditioning systems and associated pipework | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BEJ8 | MEM40119 | Certificate IV in Engineering | Qualification |
| BEK0 | MEM50119 | Diploma of Engineering - Advanced Trade | Qualification |
| BEK2 | MEM30119 | Certificate III in Engineering - Production Systems | Qualification |
| BEL0 | MEM20219 | Certificate II in Engineering - Production Technology | Qualification |
| BEK9 | MEM31319 | Certificate III in Refrigeration and Air Conditioning | Qualification |
| BIV6 | MEM31322 | Certificate III in Refrigeration and Air Conditioning | Qualification |