Unit of competency Outline
Date retreived
23/07/2026 11:28 AM AWST
23/07/2026 11:28 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Construct a basic roll-up blind
Construct a basic roll-up blind
Unit of competency
National Code
MSFBA1001
MSFBA1001
State Code
WI251
WI251
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
19/06/2014
Field of Education
030199 - Manufacturing Engineering And Technology, N.e.c.
Original Release Date
19/06/2014
Nominal Hours
30
Description
This unit of competency covers constructing a basic roll-up blind ready for installation. Applications may include a variety of employment-related skills, including preparatory access and participation skills, broad-based induction skills and/or specific workplace skills. They may also include participation in a team or work group.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare for work
- 1.1 Work health and safety (WHS) requirements, including personal protection needs, are observed throughout the work
- 1.2 Work orders are checked and confirmed with appropriate personnel
- 1.3 Tools and equipment suitable for construction are identified and checked for safe and effective operation
- 1.4 Materials are selected and checked
- 1.5 Hardware is selected according to work instructions
2 Complete construction
- 2.1 Allowances for hardware, joins and hems are calculated and recorded
- 2.2 Material is laid out laid out flat and square on a cutting table large enough to take full width of material and marked using chalk, markers or pencil according to work instructions
- 2.3 Fabric is cut according to work order
- 2.4 Bottom and side hems are finished
- 2.5 Spline is selected, cut and attached to top of blind
- 2.6 Roller is cut to length and attached to spline
- 2.7 Control mechanism and pin end are attached
- 2.8 Lath and pull ring are attached
- 2.9 Child safety mechanisms are selected and attached
3 Apply quality checks
- 3.1 Finished blind is checked against work order and tested within limits of normal operation for correct operation
- 3.2 Parts of the work that do not comply with work order are repaired or re-worked
4 Finalise operation and maintain equipment
- 4.1 Completed work is cleaned, packaged and stored
- 4.2 Tools and equipment are cleaned, maintained and stored and any faulty tools and equipment are reported to supervisor
- 4.3 Work area is cleaned and waste is disposed of according to workplace practices
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OEJ83 | MSFFP2016 | Construct a basic roll-up blind | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J724 | MSF10113 | Certificate I in Furnishing | Qualification |